Meta Singapore Data Center

Singapore, Singapore · Singapore market

Meta Singapore Data Center is a data center project in Singapore, operated by Meta. It is operational. The only published capacity figure is 150 MW of total facility power. IT load will be lower.

Latest change on record: moved to operational in 2022.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
150 MW
Total facility power
Running now
Not disclosed
Operator
Meta
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

hyperscaler self-build (Meta own-use)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Full fit-out · Operational150 MW

Stage history

2018-09Under construction · engineering.fb.com
2022Operational · dgtlinfra.com

Who is behind it

OperatorMeta · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerMeta (own use) · confirmed

Whole campus, Meta's first APAC data centre, 11 storeys on 12 acres at Tanjong Kling · as of 2022-10-14

Meta's own careers blog describes the Tanjong Kling facility as its first APAC data centre supporting Meta services for the region. Adds a Meta-authored source to an existing confirmed row.

Source · Singapore Data Center: Building and innovating from the ground up (Meta, 2022-10-14)

Money at this site

Announced investment, 2018-09S$1,400m (about US$1.0bn)
Project team
Engineering consultantTYLin · completed Confirmed source ↗
Accredited checker for civil and structural systems, including foundations, superstructure and anchorage.
Main contractorFortis Construction · Sep 2018 · completed Confirmed source ↗
General contractor for Facebook's first custom-built data centre in Asia. Fortis opened its first international office in Singapore for the job.
Civil and structural worksObayashi · completed Inferred by ArusGrid source ↗
Named by PERI as its partner on the core wall climbing formwork job for the building. Its exact role is not stated.
Why we think so. PERI's project page for a 'Data Center @ Sunview Drive' describes an 11 storey building of about 170,000 sqm drawing up to 150MW at full operation. That matches Meta's Tanjong Kling facility, the only building of that size and power in the area. The page does not name Meta and calls the client only 'the developer'.
Land
Site12 acres · Sep 2018 Reported source ↗
Tanjong Kling Data Centre Park (JTC estate); a Sept 2018 law-firm deal note says JTC, PUB, IMDA and EDB were in the negotiations but does not state tenure, so landlord not asserted Counterparty not disclosed.
Power supply
Renewable power dealSunseap Group · 100 MW · Oct 2020 Reported source ↗
100MW rooftop solar, completion 2022 · Supports Facebook SG data centre operations · Covers the operator's wider portfolio in this country, not this site alone.
Renewable power dealSembcorp Solar Singapore Pte Ltd (Sembcorp Industries, SGX) · 150 MW · Mar 2025 Confirmed source ↗
About 150MWp floating solar PV system on Kranji Reservoir, built, owned and operated by Sembcorp. 25-year renewable energy purchase agreement with Malkoha Pte Ltd, a Meta subsidiary. Construction expected to start in the first half of 2027, subject to conditions and approvals. · Sembcorp says the system will support Meta's operations in the region, including its data centre operations in Singapore. It is not tied to this building alone, so scope is platform. Capacity is MWp (DC), not contracted MW. · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
CoolingEvaporative cooling · design PUE 1.19 Confirmed source ↗
StatePoint Liquid Cooling (SPLC), indirect evaporative system developed with Nortek Air Solutions; reduces peak water use >20% vs alternatives in Singapore climate

Sources

  1. datacentermap.com
  2. datacenterdynamics.com
  3. baxtel.com
  4. Facebook to build $1bn multi-story data center in Singapore (DatacenterDynamics, 2018-09-06)
  5. Rethinking data center design for Singapore (Facebook Engineering, 2019-01-14)
  6. Meta's Data Center Locations for Facebook and Instagram (Dgtl Infra, 2024-06-21)
  7. Facebook Singapore Tanjong Kling Data Center (TYLin)
  8. Singapore Data Center: Building and innovating from the ground up (Meta Careers, 2022-10-14)
  9. Rethinking data center design for Singapore (Engineering at Meta, 2019-01-14)
  10. SEMBCORP SIGNS 25-YEAR RENEWABLE ENERGY PURCHASE AGREEMENT WITH MALKOHA (Sembcorp Industries (SGX announcement), 2025-03-28)
  11. Facebook's first Asian data centre in Singapore (Rajah & Tann Asia, 2018-09-10)