Equinix JH1 + JH2 data center

Iskandar Puteri, Johor, Malaysia · Johor market · location approximate to district level

Equinix JH1 + JH2 is a data center project in Iskandar Puteri, Malaysia, operated by Equinix. It is operational and expanding. It is planned for 13 MW of IT load. The operator reports 6 MW running.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
13 MW
Running now
6 MW
Operator
Equinix
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: committed or approved capital, dated, sized phase, three or more sources. Criteria.

AI workloads

StatusConfirmed

JH2 liquid-cooled build

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

JH1 · Operational6 MW, target 2024
JH2 (1,100 racks) · Under construction7 MW, target 2027

Who is behind it

OperatorEquinix · Colocation

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025-11US$241m

The figure covers the whole campus.

Power supply
Power allocation or planMay 2024 Confirmed source ↗
Equinix says its Malaysia data centers are 100% covered by renewables. · Statement covers the Malaysia platform, not JH1 alone. Mechanism not stated. · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
CoolingDirect liquid cooling Reported source ↗
JH2 building: liquid-cooled for private AI workloads

Sources

  1. newsroom.equinix.com
  2. datacenterdynamics.com
  3. Equinix's Dual Metro Data Centers Propel Malaysia's Digital Economy Ambition to New Heights (Equinix, 2024-05-27)

More in Johor

Also run by Equinix

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com