Equinix JH1 + JH2

Iskandar Puteri, Johor, Malaysia · Johor market · location approximate to district level

Equinix JH1 + JH2 is a data center project in Iskandar Puteri, Malaysia, operated by Equinix. It is operational and expanding. It is planned for 13 MW of IT load. The operator reports 6 MW running.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
13 MW
Running now
6 MW
Operators rarely publish this
Operator
Equinix
Colocation
AI workloads
Confirmed
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusConfirmed

JH2 liquid-cooled build

Phases

JH1 · Operational6 MW, target 2024
JH2 (1,100 racks) · Under construction7 MW, target 2027

Who is behind it

OperatorEquinix · Colocation

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025-11US$241m

The figure covers the whole campus.

Water and cooling
CoolingDirect liquid cooling Reported source ↗
JH2 building: liquid-cooled for private AI workloads

Sources checked 2026-08-28

  1. newsroom.equinix.com
  2. datacenterdynamics.com

More in Johor

Also run by Equinix

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.