AdaniConneX Ghansoli campus is a data center project in Ghansoli, Navi Mumbai, India, operated by AdaniConneX. It is under construction. The published capacity figure is 220 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as under construction on 28 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
220 MW
unstated
Running now
Not disclosed
Operator
AdaniConneX
Joint venture
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: named funder, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2026-10-28Under construction · bseindia.com

Who is behind it

OperatorAdaniConneX · Joint venture
Funder, Joint venture partnerAdani Enterprises
Funder, Joint venture partnerEdgeConneX

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources

  1. Submission of Investor Presentation on Unaudited Financial Results (Standalone and Consolidated) for the quarter and half year ended on September 30, 2026 (Adani Enterprises Limited (BSE filing), 2026-10-28)
  2. Adani Enterprises Limited Earnings Presentation Q1 FY27 (Adani Enterprises Limited, 2026-07-29)

More in Mumbai metro

Also run by AdaniConneX

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com