Iron Mountain MUM-3 is a data center project in Navi Mumbai, India, operated by Iron Mountain Data Centers (Web Werks JV). It is under construction. It is planned for 85 MW of IT load.
Latest change on record: moved to under construction in January 2026.
Next gate to watch: Builder appointed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Construction or financing is evidenced, or several independent signals agree. On record: named funder, disclosed client (confirmed), dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.
Operator describes hyperscale-ready capacity; 85MW greenfield.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.
51.5MW pre-leased at MUM-3, which is 100% of the 51.5MW Iron Mountain lists as under construction there · as of 2026-09-30
Iron Mountain's Q3 2026 supplemental lists India MUM-3 with 51.5MW under construction and 51.5MW pre-leased (100%). The Q3 2026 earnings presentation says 51MW was leased in Mumbai. The customer is not named, and no filing says it is a hyperscaler.
Source · Supplemental Financial Information Third Quarter 2026 (Iron Mountain Incorporated (SEC Form 8-K, Exhibit 99.3), 2026-11-05)
No figure has been announced. This range is 85 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
All projects in Mumbai metro · All projects in India · All Iron Mountain projects · All projects under construction · Data center rules in India · Full directory