ArusGridProject
Directory › India › Mumbai metro › ESR MU1 Rabale

ESR MU1 Rabale data center

Navi Mumbai (Rabale), Maharashtra, India · Mumbai metro market · location approximate to district level

ESR MU1 Rabale is a data center project in Navi Mumbai (Rabale), India, operated by ESR. It has been announced and has not yet reached the land or permitting stage. It is planned for 60 MW of IT load.

Latest change on record: entered the record as announced on 25 February 2026. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
60 MW
Running now
Not disclosed
Operators rarely publish this
Operator
ESR
Local developer
AI workloads
No signal either way
Evidence grade
Sourced

Where it sits

Mumbai metro holds 25 active projects with 2,020 MW of planned IT load between them, and ESR MU1 Rabale ranks 12th by planned capacity. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 6 are at the land and permitting stage and 3 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

It is the only ESR Group project ArusGrid tracks. Named funding comes from ESR Group on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 25 February 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 25 February 2026, and last checked the record on 2 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-02-25Announced · esr.com

Who is behind it

OperatorESR · Local developer
Funder, EquityESR Group

Who uses the compute

Tenant · enterpriseUndisclosed ICT company · reported, unconfirmed

as of 2026-02-25

ESR release says the building is pre-leased to an ICT company it does not name.

Source · ESR Enters India Data Centre Market with 60 MW Facility in Mumbai (ESR, 2026-02-25)

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. ESR Enters India Data Centre Market with 60 MW Facility in Mumbai (ESR, 2026-02-25)
  2. ESR Enters India Data Centre Market With $100M Mumbai Project (Mingtiandi, 2026-02-25)

More in Mumbai metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.