ArusGrid tracks 15 active data center projects in Navi Mumbai, India, with 1,490 MW of planned IT load. Of these, 1 is operational, 4 are operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 607 MW. Operators have disclosed 112 MW actually running.
Navi Mumbai sits in the Mumbai metro market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is NTT Navi Mumbai 2 (NAV2) at 336 MW, announced only. The operators with the most planned capacity here are NTT (436 MW across 2 projects), Digital Edge (300 MW across 1 project) and PDG (270 MW across 2 projects).
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| NTT Navi Mumbai 2 (NAV2) | Navi Mumbai | Announced | 336 | undisclosed | NTT Global Data Centers | Likely |
| Digital Edge BOM1 campus | Navi Mumbai | Under construction | 300 * | undisclosed | Digital Edge DC | Likely |
| PDG MU1 campus | Navi Mumbai | Expanding | 150 | 48 | Princeton Digital Group | Likely |
| PDG MU2 | Navi Mumbai | Under construction | 120 | undisclosed | Princeton Digital Group | Likely |
| NTT Navi Mumbai 1 (NAV1) campus | Navi Mumbai | Expanding | 100 | 30 | NTT Global Data Centers | No signal either way |
| Colt Airoli expansion campus | Navi Mumbai (Airoli) | Land and permitting | 100 * | undisclosed | Colt Data Centre Services | No signal either way |
| Iron Mountain MUM-3 | Navi Mumbai | Under construction | 85 | undisclosed | Iron Mountain Data Centers (Web Werks JV) | Likely |
| CapitaLand Data Centre Navi Mumbai | Navi Mumbai | Expanding | 71 | 34 | CapitaLand India | No signal either way |
| AirTrunk BOM1 (ex-Lumina Airoli) | Navi Mumbai | Under construction | 62 | undisclosed | AirTrunk (Lumina CloudInfra) | Likely |
| ESR MU1 Rabale | Navi Mumbai (Rabale) | Announced | 60 | undisclosed | ESR | No signal either way |
| Sify Rabale campus | Navi Mumbai | Expanding | 43 | undisclosed | Sify Infinit Spaces | Likely |
| L&T Vyoma Mahape | Navi Mumbai (Mahape) | Under construction | 40 * | undisclosed | Larsen & Toubro Vyoma | Likely |
| Colt Mumbai 1 and 2 | Navi Mumbai | Operational | 22 | undisclosed | Colt Data Centre Services | No signal either way |
| AWS Airoli | Navi Mumbai | Land and permitting | none published | undisclosed | Amazon Web Services | Likely |
| EverYondr Mumbai 1 (Google build-to-suit) | Navi Mumbai | Land and permitting | none published | undisclosed | EverYondr (Everstone Group) | Likely |