Colt Mumbai 1 and 2 data center

Navi Mumbai, Maharashtra, India · Mumbai metro market · location approximate to district level

Colt Mumbai 1 and 2 is a data center project in Navi Mumbai, India, operated by Colt Data Centre Services. It is operational. It is planned for 22 MW of IT load.

Latest change on record: entered the record as operational on 14 September 2023.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
22 MW
Running now
Not disclosed
Operator
Colt Data Centre Services
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Mumbai 1 and 2 · Operational22 MW, target 2023

Stage history

2023-09-14Operational · w.media

Who is behind it

OperatorColt Data Centre Services · Colocation
Funder, EquityFidelity (Colt parent)
Funder, Joint venture partnerRMZ

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$124m to US$168m

No figure has been announced. This range is 22 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Project team
Engineering consultantSneha Hi-Tech Products · Nov 2019 · completed Confirmed source ↗
Environmental consultant named on the 2019 environmental clearance for the Airoli Data Center Park
Project managerTurner & Townsend · 2022 · completed Confirmed source ↗
End-to-end project management, cost management and contract administration for Data Centre Holdings India (DCHI) at Dighe, Navi Mumbai: two core-and-shell data centre buildings, one 3MW data hall, a 220kV substation, ancillary buildings and office space. The page gives the work as started 2020 and completed 2022.
Power supply
Dedicated substation220kV · Oct 2026 Reported source ↗
A 220kV gas-insulated substation on the Navi Mumbai campus, described with Mumbai 3. The 100 percent renewable claim is for Mumbai 3 only. · Applies to the whole campus.
Grid supplyUtility not named · 150 MVA · Nov 2018 Inferred by ArusGrid source ↗
Colt said it had secured a super high-voltage utility feed of 150 MVA to its Mumbai site. · Applies to the whole campus.
Why we think so. The release names only Mumbai. Colt's first and at the time only India site is the Airoli campus that holds Mumbai 1 and 2.
Grid supplyMaharashtra State Electricity Distribution Co. Ltd (MSEDCL) · 169 MVA · 220kV · Nov 2019 Confirmed source ↗
The EC names MSEDCL as the source of power. Operation-phase demand load is 135MW (169 MVA) and connected load 197MW (246 MVA) for the entire project, through 2 transformers of 150 MVA at 220/11kV. Backup is 118 DG sets of 2,250 kVA. These are design figures for the whole Airoli data center park, not Mumbai 1 and 2 alone. · Applies to the whole campus.
Water and cooling
CoolingAir cooled · design PUE 1.4 Confirmed source ↗
PDX cooling units, N+2 per 500 to 1,000 sqm data hall, hot aisle containment
WaterMains drinking water · MIDC · 81 m³ a day Confirmed source ↗
Fresh water from MIDC of 81 CMD covers drinking, filter backwash, wash down points and AC and DG make-up water. Total dry-season demand is 152 CMD including 71 CMD of recycled water for flushing and gardening. The 2025 compliance report gives 74 KLD of wastewater to two 50 KLD STPs and zero discharge in the dry season. Whole-campus figures.

Sources

  1. Indian Hyperscale Data Centre Located in Mumbai | Colt Mumbai 1 and 2 Data Centres | Colt DCS (Colt DCS (operator site, accessed), 2026-09-27)
  2. Colt Data Centre Services Expands into India with Cutting-Edge Navi Mumbai Data Centre (W.Media, 2023-09-14)
  3. Colt DCS and RMZ Start Work on 64MW AI Data Centre in Mumbai (Data Centre Magazine, 2026-10-15)
  4. Colt Mumbai datasheet (Colt Data Centre Services)
  5. Colt Data Centre Services enters major new market in Mumbai (Colt Data Centre Services, 2018-11-27)
  6. Environment Clearance for Proposed Data Center Park (SEIAA Maharashtra (Environment Department, Government of Maharashtra), published on the RMZ x Colt DCS JV page, 2019-11-10)
  7. Half Yearly Compliance Report 2025 (01 Apr - 30 Sep), Proposed Data Center Park by Data Center Holdings India LLP (Data Center Holdings India LLP, published on the RMZ x Colt DCS JV page, 2025-07-26)
  8. Data centre building in India, blue skies (Turner & Townsend)
  9. Minutes of 12th CAC Meeting of 2025-26 (Booklet No. 12) (Maharashtra Pollution Control Board, 2025-12-01)