AWS Taloja (Asode-Burdul) is a data center project in Taloja, Navi Mumbai, India, operated by Amazon Web Services (Amazon Data Services India). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as land and permitting on 3 April 2026. Record last checked against its sources on 18 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and AWS Taloja (Asode-Burdul) has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.
AWS has 4 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AWS Thane (Balkum-Majiwada), AWS Asia Pacific (Hyderabad) region, existing sites and AWS Bharat Future City campus. Named funding comes from Amazon on the equity side. The named user of the compute is Amazon Web Services (reported, unconfirmed).
The stage was recorded as at the land and permitting stage on 3 April 2026. The money on record is US$430m as of April 2026, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 28 April 2026, and last checked the record on 18 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Hyperscaler self-build at the planning stage; no AI hardware disclosed.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Self-build of six buildings on 49 acres at Asode and Burdul villages · as of 2026-04-14
Amazon Data Services India is the environmental clearance applicant for this site per DCD.
Source · AWS plans $430m data center in Navi Mumbai, India (DCD, 2026-04-14)
An own-use build. No colocation price applies.
All projects in Mumbai metro · All projects in India · All AWS projects · All projects at the land and permitting stage · Data center rules in India · Full directory