ArusGridProject
Directory › India › Mumbai metro › ReNew Green Data Centre Park, MMR

ReNew Green Data Centre Park, MMR

Navi Mumbai and Raigad (Panvel, Khalapur, Taloja, Bhokharpada), Maharashtra, India · Mumbai metro market · location approximate to city level

Also listed as ReNew Maharashtra green data centre park.

ReNew Green Data Centre Park, MMR is a data center project in Navi Mumbai and Raigad (Panvel, Khalapur, Taloja, Bhokharpada), India, operated by ReNew. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as announced on 9 October 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
ReNew
Local developer
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
○ Land secured✓ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and ReNew Green Data Centre Park, MMR has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

ReNew Energy Global has 1 other in India tracked by ArusGrid, including ReNew AP Green Data Center. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 9 October 2026. The money on record is INR 700bn as of October 2026, the announced investment.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 13 October 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-10-09Announced · energetica-india.net

Who is behind it

OperatorReNew · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-10INR 700bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Power supply
Grid supplyOct 2026 Reported source ↗
The park must use 51 percent green power for its operations. · Dedicated power infrastructure with two incoming feeders from independent sources to the park substation. Utility and voltage not named. · Applies to the whole campus.

Sources checked 2026-10-19

  1. ReNew Signs INR 70,000 Crore Pact for Green Data Centre Park in Maharashtra (Energética India, 2026-10-09)
  2. ReNew Wind Energy signs MoU with Maharashtra gov’t for US$ 7.3 billion green DC park (W.Media, 2026-10-12)
  3. ReNew signs Rs 700 billion MoU with Maharashtra government to develop green integrated data centre park in MMR (Indian Infrastructure, 2026-10-13)

More in Mumbai metro

Also run by ReNew Energy Global

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.