ArusGridProject
Directory › India › Mumbai metro › AirTrunk Raigad (Pen) campus

AirTrunk Raigad (Pen) campus

Pen, Raigad, Maharashtra, India · Mumbai metro market · location approximate to city level

AirTrunk Raigad (Pen) campus is a data center project in Pen, Raigad, India, operated by AirTrunk. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as announced on 1 June 2026. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
AirTrunk
Colocation
AI workloads
No signal either way
Evidence grade
Sourced

Where it sits

Mumbai metro holds 25 active projects with 2,020 MW of planned IT load between them, and AirTrunk Raigad (Pen) campus has no published figure so it sits outside that ranking. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 6 are at the land and permitting stage and 3 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

AirTrunk has 2 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AirTrunk MAA1 and AirTrunk BOM1 (ex-Lumina Airoli). Named funding comes from Blackstone on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 1 June 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 2 June 2026, and last checked the record on 2 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-06-01Announced · aninews.in

Who is behind it

OperatorAirTrunk · Colocation
Funder, EquityBlackstone

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. Maharashtra issues Letter of Intent to AirTrunk for Rs 2 lakh crore data centre project in Raigad (ANI, 2026-06-01)
  2. Maharashtra issues Letter of Intent to AirTrunk for Rs 2 lakh crore data center project (W.Media, 2026-06-02)

More in Mumbai metro

Also run by AirTrunk

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.