ArusGrid tracks 6 active data center projects operated by Digital Edge, with 743 MW of planned IT load, across Indonesia, India, Thailand and Malaysia. Of these, 1 is operational, 1 is operational and expanding, 2 are under construction, 1 is at the land and permitting stage and 1 is announced only. Projects under construction or commissioning account for 600 MW.
ArusGrid classes the operator as colocation. Projects appear under the names Digital Edge DC. The largest project is Digital Edge CGK Campus (CGK1 to CGK4), Cikarang at 500 MW in Greater Jakarta, under construction. AI workloads are confirmed at 1 site. Named funders across its projects are Stonepeak, National Investment and Infrastructure Fund (NIIF), AGP DC InvestCo, B.Grimm Power, Bangkok Bank and Bank of Ayudhya. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Digital Edge CGK Campus (CGK1 to CGK4), Cikarang | Cikarang, Bekasi | Under construction | 500 | undisclosed | Digital Edge | Confirmed |
| Digital Edge BOM1 campus | Navi Mumbai | Expanding | 120 | undisclosed | Digital Edge DC | Likely |
| Digital Edge / B.Grimm BKK Campus (Chonburi) | Chonburi (EEC) | Under construction | 100 | undisclosed | Digital Edge | Likely |
| Digital Edge EDGE2, Jakarta | Jakarta | Operational | 23 | undisclosed | Digital Edge | No signal either way |
| Digital Edge Palava | Palava (Dombivli) | Land and permitting | none published | undisclosed | Digital Edge DC | Likely |
| Digital Edge Johor BCIP | Kota Tinggi (Bandar Cemerlang) | Announced | none published | undisclosed | Digital Edge | No signal either way |
All operators · Full directory