Digital Edge CGK Campus (CGK1 to CGK4), Cikarang

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

Digital Edge CGK Campus (CGK1 to CGK4), Cikarang is a data center project in Cikarang, Bekasi, Indonesia, operated by Digital Edge. It is under construction. It is planned for 500 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
500 MW
Running now
0 MW
Operators rarely publish this
Operator
Digital Edge
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusConfirmed

Operator states the campus features liquid cooling to support AI workloads, targets PUE 1.25, and is 'purpose-built for AI and data-intensive workloads' (Jun 2026 PR). CGK1 'developed in line with committed customer requirements'.

Phases

CGK1 · Under constructionSize not published, target 2026
CGK2 · Under constructionSize not published, target 2027
CGK3 · Under constructionSize not published, target 2027
CGK4 · AnnouncedSize not published

Who is behind it

OperatorDigital Edge · Colocation
Funder, EquityStonepeak
Client, reported, unconfirmedUndisclosed committed customer

Money at this site

Announced investment, 2026-06US$4.5bn

The figure covers the whole campus.

Platform deals that include it

Digital Edge and PLN 1.45 GW single-campus power agreement (CGK Campus)
Power deal, 2026-06
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Land
Industrial estateGreenland International Industrial Center (GIIC), Kota Deltamas Reported source ↗
Seller likely PT Puradelta Lestari (IDX DMAS), which owns the estate
Power supply
Grid supplyPLN · 1,450 MVA · Jun 2026 Confirmed source ↗
Dual feed, 2 x 725 MVA, upgraded from 2 x 650 MVA; target PUE 1.25 · Applies to the whole campus.
Water and cooling
WaterRecycled wastewater Confirmed source ↗
CoolingDirect liquid cooling · design PUE 1.25 Confirmed source ↗
Recycled water systems and liquid cooling for AI workloads

Sources checked 2026-09-11

  1. id.digitaledgedc.com
  2. id.digitaledgedc.com
  3. datacenterknowledge.com

More in Greater Jakarta

Also run by Digital Edge

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.