BDx CGK5, Suryacipta City of Industry data center

Karawang, West Java, Indonesia · Greater Jakarta market · location approximate to district level

BDx CGK5, Suryacipta City of Industry is a data center project in Karawang, Indonesia, operated by BDx Indonesia. It is under construction. It is planned for 100 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
100 MW
Running now
0 MW
Operator
BDx Indonesia
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

Part of BDx's 'national AI infrastructure platform' with PLN; greenfield hyperscale build with 385 MVA grid allocation secured Jun 2026.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Who is behind it

OperatorBDx Indonesia · Joint venture
Funder, EquityI Squared Capital
Funder, Joint venture partnerIndosat Ooredoo Hutchison
Funder, Joint venture partnerLintasarta

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$953m to US$1.4bn

No figure has been announced. This range is 100 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

BDx and PLN 1.2 GW national power commitment
Power deal, 2026-06
Not disclosed
BDx Indonesia US$320m loan (Permata, BCA, KB Bank)
Debt, 2026-04-01
US$320m

Platform capital spans several sites. It is never added to this project's own figure.

Land
Industrial estateSuryacipta City of Industry (PT Suryacipta Swadaya, Surya Semesta Internusa) · 12 acres · Nov 2022 Reported source ↗
Purchase or lease terms not disclosed.
Industrial estatePT Suryacipta Swadaya (Suryainternusa Group) · 12 acres · Nov 2022 Reported source ↗
12 acres in Suryacipta City of Industry, Karawang. Transaction type not stated.
Power supply
Grid supplyPLN · 385 MVA · Jun 2026 Reported source ↗
385 MVA network development for CGK5 Suryacipta, part of BDx 1.2 GW commitment
Grid supplyPT PLN (Persero) · 385 MVA · Jun 2026 Reported source ↗
Up to 385 MVA for CGK5 Suryacipta under power supply agreements totalling 1.2GW across BDx sites. · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Confirmed source ↗
BDx's CGK5 page lists liquid cooling among AI and high-density features.

Sources

  1. bdxworld.com
  2. bdxworld.com
  3. bdxworld.com
  4. BDx Data Centers signs 1.2GW of power supply agreements with Indonesian utility PLN (DatacenterDynamics, 2026-06-03)
  5. CGK5 | BDx Data Centers (BDx Data Centers, 2026-09-09)
  6. BDx Secures US$320 Million Loan to Accelerate AI-Ready Data Center Infrastructure in Asia (BDx Data Centers (PR Newswire), 2026-04-01)
  7. SSIA Kantongi Order Data Center, 2 Lokasi Kawasan Jadi Incaran (Emitennews, 2026-09-08)
  8. BDx Indonesia to Develop 100MW Data Center in Suryacipta City Jakarta (W.Media, 2022-11-14)
  9. BDx breaks ground on AI data center in West Java; first 120MW building to be ready by early 2027 (W.Media, 2026-09-23)
  10. Berkah Proyek Data Center, Laba & Pendapatan SEMA Diproyeksi Meningkat (EmitenNews, 2026-10-02)

More in Greater Jakarta

Also run by BDx

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com