Data centers in Karawang

Indonesia · dataset updated 2026-10-02

ArusGrid tracks 5 active data center projects in Karawang, Indonesia, with 748 MW of planned IT load. Of these, 2 are operational, 2 are operational and expanding and 1 is under construction. Projects under construction or commissioning account for 100 MW. Operators have disclosed 27 MW actually running.

Karawang sits in the Greater Jakarta market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is DCI H2 Campus (H2-01, H2-02), Karawang at 600 MW, operational and expanding. The operators with the most planned capacity here are DCI Indonesia (600 MW across 1 project), BDx (100 MW across 1 project) and Microsoft (48 MW across 1 project).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
DCI H2 Campus (H2-01, H2-02), KarawangKarawangExpanding60027DCI IndonesiaLikely
BDx CGK5, Suryacipta City of IndustryKarawangUnder construction100undisclosedBDx IndonesiaLikely
Microsoft JKT09 / JKT02 (KIIC Karawang campus)Karawang (Karawang International Industrial City)Expanding48 *undisclosedMicrosoftConfirmed
AWS CGK Kutanegara (Karawang)KarawangOperationalnone publishedundisclosedAmazon Web ServicesLikely
AWS CGK Margamulya (KIIC Karawang)KarawangOperationalnone publishedundisclosedAmazon Web ServicesLikely

Market pages

Other cities in Indonesia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.