Directory › Indonesia › Greater Jakarta › EdgeConneX Jakarta campus (JKT01+), Cikarang

EdgeConneX Jakarta campus (JKT01+), Cikarang

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

EdgeConneX Jakarta campus (JKT01+), Cikarang is a data center project in Cikarang, Bekasi, Indonesia, operated by EdgeConneX. It is operational and expanding. It is planned for 200 MW of IT load. The operator reports 8 MW running.

Latest change on record: moved to expanding on 15 September 2023.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
200 MW
Running now
8 MW
Operator
EdgeConneX
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

Campus expansion to 200+MW explicitly justified by 'surging demand ... led by cloud and AI technologies' (Dec 2024). Existing JKT01 is a legacy 6MW building.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

JKT01 (ex-GTN facility) · Operational6 MW, target 2016
Campus expansion · AnnouncedSize not published
JKT02 (Lippo Cikarang) · Operational2 MW, target 2025

Stage history

2015-07-02Under construction · multipolar.com
2016-08Operational · thejakartapost.com
2023-09-15Expanding · indonesiabusinesspost.com

Who is behind it

OperatorEdgeConneX · Colocation
Funder, EquityEQT

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

ArusGrid estimate, building costabout US$1.9bn to US$2.8bn

No figure has been announced. This range is 200 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Land sellerPT Lippo Cikarang Tbk · 45,000 sqm · Oct 2024 Reported source ↗
Plot in Lippo Cikarang Cosmopolis, next to the existing campus. Price and title type not disclosed.
Land sellerGTN Data Center JV (PT Multipolar Technology, Lippo Group, 65% and Mitsui 35%) · 40,000 sqm · May 2022 Reported source ↗
About 40,000 sqm of land next to the operating GTN facility came with the April 2022 acquisition of the JV. Terms not disclosed. This is separate from the 45,000 sqm held parcel.
Power supply
Grid supplyPT Cikarang Listrindo Tbk (POWR) · Nov 2021 Inferred by ArusGrid source ↗
Kontan (23 Nov 2021) names PT Graha Teknologi Nusantara (GTN) as one of four data centre customers of Cikarang Listrindo, which then had 62 MVA of connected data centre load across DCI, GTN, NTT Indonesia and PDG. This was before EdgeConneX bought the GTN facility in 2022. No later source confirms the supply continues under EdgeConneX.
Why we think so. The GTN data centre in Cikarang is the facility EdgeConneX acquired in 2022 (JKT01). The article names GTN, not EdgeConneX, and gives no figure for GTN alone.
Water and cooling
CoolingWater-cooled chillers Confirmed source ↗
Operator data sheet lists N+1 water-based chilled cooling. It describes the existing 6MW N+1 building (JKT01) at Jl. Mataram, Lippo Cikarang, not later phases.

Sources

  1. edgeconnex.com
  2. datacenterdynamics.com
  3. datacentermap.com
  4. Jakarta Data Sheet Q1 update (EdgeConneX, 2026-03)
  5. Jakarta Data Sheet (EdgeConneX)
  6. EdgeConneX launches data center in Indonesia to tap into growing digital economy (Indonesia Business Post, 2023-09-15)
  7. EdgeConneX enters Indonesian market with data center acquisition (Edge Industry Review, 2022-04-29)
  8. EQT's EdgeConneX Acquires Lippo-Mitsui Indonesia Data Centre JV (Mingtiandi, 2022-05-01)
  9. Ekspansi Pusat Data, EdgeConnex Akuisisi Lahan Lippo Cikarang (LPCK) (Bisnis.com, 2024-10-31)
  10. Multipolar Technology (MLPT) Raih Persetujuan Divestasi Data Center ke EdgeConnex (Bisnis.com, 2022-05-03)
  11. Cikarang Listrindo (POWR) menyuplai aliran listrik ke perusahaan data center (Kontan, 2021-11-23)
  12. GTN eyes opportunities from rising demand for data storage (The Jakarta Post, 2016-11-17)
  13. Graha Teknologi Nusantara Officially Starts Construction of the First Data Center with Japanese Standards in Indonesia (PT Multipolar Technology Tbk, 2015-07-03)