Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung

East Jakarta (Jakarta Industrial Estate Pulogadung), DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to district level

Aslan Jakarta Data Centre (AJDC), JIEP Pulogadung is a data center project in East Jakarta (Jakarta Industrial Estate Pulogadung), Indonesia, operated by Aslan Energy Capital. It has been announced and has not yet reached the land or permitting stage. It is planned for 40 MW of IT load.

Latest change on record: entered the record as announced on 16 June 2025.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
40 MW
Running now
Not disclosed
Operator
Aslan Energy Capital
Local developer
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

One or two hard signals sit behind the announcement. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Phase 1 · Land and permittingSize not published, target 2027

Stage history

2025-06-16Announced · intelligentcio.com

Who is behind it

OperatorAslan Energy Capital · Local developer
Funder, EquityAslan Energy Capital
Funder, Joint venture partnerJakarta Industrial Estate Pulogadung (JIEP)

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$381m to US$516m

No figure has been announced. This range is 40 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Industrial estatePT Jakarta Industrial Estate Pulogadung (JIEP) · 40,000 sqm · Jun 2025 Reported source ↗
Binding heads of agreement with JIEP. About 40 percent of the site is built on, the rest green buffer.
Power supply
Power allocation or planJun 2025 Reported source ↗
Primarily renewable · Mainly renewable power with a 120MW battery storage system. Purchase route not stated.
Water and cooling
CoolingAir cooled Reported source ↗
Hybrid air-cooled heat exchangers with no cooling towers.

Sources

  1. prnewswire.com
  2. datacenterdynamics.com
  3. Aslan Energy and JIEP to build 40MW data center in Jakarta (W.Media, 2025-06-24)
  4. Aslan Energy Capital and JIEP to develop East Jakarta's renewable-powered hyperscale data centre (Intelligent CIO APAC, 2025-06-16)
  5. Aslan Energy Capital signs binding agreement in Jakarta for data centre with 120MWh BESS (Energy-Storage.news, 2025-06-17)