Indonesia · dataset updated 2026-09-27

ArusGrid tracks 3 active data center projects operated by BDx, with 220 MW of planned IT load, across Indonesia. Of these, 1 is operational and expanding, 1 is under construction and 1 is being commissioned. Projects under construction or commissioning account for 100 MW.

ArusGrid classes the operator as joint venture. Projects appear under the names BDx Indonesia. The largest project is BDx CGK4 AI Campus, Jatiluhur at 120 MW in Greater Jakarta, operational and expanding. AI workloads are confirmed at 1 site. Named funders across its projects are I Squared Capital, Indosat Ooredoo Hutchison and Lintasarta. Disclosed tenants across its projects are Lintasarta (GPU Merdeka sovereign AI cloud).

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
BDx CGK4 AI Campus, JatiluhurJatiluhur, PurwakartaExpanding120undisclosedBDx IndonesiaConfirmed
BDx CGK5, Suryacipta City of IndustryKarawangUnder construction100undisclosedBDx IndonesiaLikely
BDx CGK3A, CilandakSouth JakartaCommissioningnone publishedundisclosedBDx IndonesiaNo signal either way

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.