Nxtra by Airtel Hyderabad hyperscale campus is a data center project in Hyderabad, India, operated by Nxtra Data. It has been announced and has not yet reached the land or permitting stage. It is planned for 60 MW of IT load.
Latest change on record: entered the record as announced on 18 January 2023. Record last checked against its sources on 19 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Hyderabad holds 15 active projects with 1,128 MW of planned IT load between them, and Nxtra by Airtel Hyderabad hyperscale campus ranks 6th by planned capacity. Of those, 5 are operational, 3 are under construction, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.
It is the only Bharti Airtel project ArusGrid tracks. It sits on the Nxtra Hyderabad campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 18 January 2023. The money on record is INR 20bn as of January 2023, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 13 November 2024, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.