Also listed as CtrlS Bihar and CtrlS Gaya.
CtrlS Bodh Gaya AI Factory is a data center project in Bodh Gaya, India, operated by CtrlS Datacenters. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 150 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as announced on 13 October 2026. Record last checked against its sources on 19 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Other India holds 6 active projects with 410 MW of planned IT load between them, and CtrlS Bodh Gaya AI Factory ranks first by planned capacity. Of those, 1 is operational, 1 is under construction and 4 are announced only. No third party publishes a colocation vacancy rate for Other India, and ArusGrid does not estimate one.
CtrlS has 4 others in India tracked by ArusGrid, including CtrlS Chandanvelly datacenter park, CtrlS Mumbai datacenter campus (DC1 to DC7) and CtrlS Chennai datacenter park (DC1 and DC2). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 13 October 2026. The money on record is INR 100bn (about US$1.0bn) as of October 2026, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 14 October 2026, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
The operator and press describe it as a 150MW hyperscale AI factory. No GPU tenant or deployment is named.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Other India · All projects in India · All CtrlS projects · All projects announced only · Data center rules in India · Full directory