Also listed as Pi Amaravati and Pi Datacenters Amaravati.
Pi Amaravati Data Centre, Mangalagiri is a data center project in Mangalagiri, Amaravati capital region, India, operated by Pi Data Centers. It is operational. The published capacity figure is 60 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as operational on 29 July 2017. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Other India holds 6 active projects with 410 MW of planned IT load between them, and Pi Amaravati Data Centre, Mangalagiri ranks 4th by planned capacity. Of those, 1 is operational, 1 is under construction and 4 are announced only. No third party publishes a colocation vacancy rate for Other India, and ArusGrid does not estimate one.
It is the only Pi Data Centers project ArusGrid tracks. It sits on the Pi Amaravati campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as operational on 29 July 2017.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 14 April 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.