Pi Amaravati Data Centre, Mangalagiri

Mangalagiri, Amaravati capital region, Andhra Pradesh, India · Other India market · location approximate to city level

Also listed as Pi Amaravati and Pi Datacenters Amaravati.

Pi Amaravati Data Centre, Mangalagiri is a data center project in Mangalagiri, Amaravati capital region, India, operated by Pi Data Centers. It is operational. The published capacity figure is 60 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as operational on 29 July 2017. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
60 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Pi Data Centers
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Other India holds 6 active projects with 410 MW of planned IT load between them, and Pi Amaravati Data Centre, Mangalagiri ranks 4th by planned capacity. Of those, 1 is operational, 1 is under construction and 4 are announced only. No third party publishes a colocation vacancy rate for Other India, and ArusGrid does not estimate one.

It is the only Pi Data Centers project ArusGrid tracks. It sits on the Pi Amaravati campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as operational on 29 July 2017.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 14 April 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2017-07-29Operational · voicendata.com

Who is behind it

OperatorPi Data Centers · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Allocated byGovernment of Andhra Pradesh · 10 acres · Jul 2017 Reported source ↗
Allotted by the state government. Tenure not stated.

Sources checked 2026-10-19

  1. Pi Data Centers launches new DC in Mumbai, plans 23 MW expansion across India (W.Media, 2026-04-13)
  2. Pi Data Centers to launch 3MW data centre in Mumbai in August 2026 (Indian Infrastructure, 2026-04-14)
  3. Chandrababu Naidu inaugurates Asia's largest data center-Pi Amaravati in Mangalagiri (Voice&Data, 2017-07-29)
  4. Amaravati Launches Asia’s Largest Data Center in Record Time (M9 News, 2017-07-28)

More in Other India

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.