ArusGridProject
Directory › Indonesia › Greater Jakarta › PureDC Jakarta (Bekasi)

PureDC Jakarta (Bekasi) data center

Bekasi (LOGOS Metrolink Logistics Hub, Kali Abang Tengah), West Java, Indonesia · Greater Jakarta market · location approximate to district level

PureDC Jakarta (Bekasi) is a data center project in Bekasi (LOGOS Metrolink Logistics Hub, Kali Abang Tengah), Indonesia, operated by Pure Data Centres Group. It is operational. It is planned for 20 MW of IT load.

Latest change on record: entered the record as operational in May 2023.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
20 MW
Running now
Not disclosed
Operator
Pure Data Centres Group
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, three or more sources. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2023-05Operational · itnews.asia

Who is behind it

OperatorPure Data Centres Group · Colocation
Funder, EquityPure Data Centres Group
Funder, Joint venture partnerLOGOS

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$191m to US$258m

No figure has been announced. This range is 20 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Industrial estateLOGOS (Metrolink Logistics Hub) · 5.68 acres Confirmed source ↗
Site within LOGOS Metrolink Logistics Hub, partnership with LOGOS since April 2021
Power supply
Green tariffPLN Inferred by ArusGrid source ↗
powered by 100% renewable energy from two diverse substations · utility inferred
Why we think so. PLN is the sole grid utility in Bekasi
Water and cooling
CoolingClosed-loop cooling · design PUE 1.43 Confirmed source ↗
Hot aisle containment and modular cooling; WUE described as closed loop system

Sources

  1. datacenterdynamics.com
  2. puredc.com
  3. datacentermap.com
  4. Jakarta Bekasi (JKT01) (Pure DC)
  5. Pure DC launches first hyperscale data centre in Indonesia (iTnews Asia, 2023-05-31)
  6. Logos Leaps Into Data Centres With 20MW Jakarta Project (Mingtiandi, 2021-06-16)

More in Greater Jakarta