ArusGridProject
Directory › Thailand › DAMAC Digital BKK01 (EDGNEX / Proen JV), Rama 9

DAMAC Digital BKK01 (EDGNEX / Proen JV), Rama 9

Huai Khwang (Rama 9 Road, beside Rama 9 Hospital), Bangkok, Thailand · Bangkok metro market · location approximate to district level

DAMAC Digital BKK01 (EDGNEX / Proen JV), Rama 9 is a data center project in Huai Khwang (Rama 9 Road, beside Rama 9 Hospital), Thailand, operated by Daria Data Center and Cloud Services Co (DAMAC Digital Thailand / Proen). It is being commissioned. It is planned for 20 MW of IT load.

Open on the mapSuggest a correction
Stage
Commissioning
Planned IT load
20 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Daria Data Center and Cloud Services Co (DAMAC Digital Thailand / Proen)
Joint venture
AI workloads
No signal either way
Evidence grade
Corroborated
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Phases

Phase 1 · Operational5 MW, target 2025

Stage history

2026-09-07Commissioning · matichon.co.th

Who is behind it

OperatorDaria Data Center and Cloud Services Co (DAMAC Digital Thailand / Proen) · Joint venture
Funder, Joint venture partnerDAMAC Group
Funder, Joint venture partnerProen Corp

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

EDGNEX (DAMAC) x Proen Corp JV programme
Country programme, 2024-10
US$962m

Platform capital spans several sites. It is never added to this project's own figure.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-26

  1. datacenterdynamics.com
  2. damacdigital.com
  3. developingtelecoms.com
  4. Oil leak from data center contaminates water in Bangkok, Thailand (DatacenterDynamics, 2026-09-09)
  5. Bangkok data centre faces charges over illegal fuel storage (The Thaiger, 2026-09-03)
  6. กรมธุรกิจพลังงาน แจ้งความ บ.ดาตาเซนเตอร์ พระราม 9 ตุนน้ำมันไม่ได้รับอนุญาต (Thai PBS, 2026-09-03)
  7. พลังงานสั่งเชือด ดาต้าเซ็นเตอร์ พระราม 9 แอบกักตุนน้ำมัน 2 แสนลิตร (MGR Online, 2026-09-02)
  8. คุมดาต้าเซ็นเตอร์กลางกรุง กังวลไม่ต้องขอ EIA-หวั่นแย่งน้ำไฟ (Prachachat, 2026-07-15)
  9. เปิดสาเหตุ กลิ่นน้ำมันใกล้ ดาต้าเซ็นเตอร์ พระราม 9 น้ำมันรั่วช่วงทดสอบ-ชุ่ยล้างลงท่อน้ำทิ้ง (Matichon, 2026-09-07)
  10. DAMAC's Thailand data centre expansion faces Bangkok scrutiny (The Nation, 2026-09-08)

More in Bangkok metro

Also run by DAMAC Digital (EDGNEX)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.