Bang Na, Bangkok, Thailand · Bangkok metro market · location approximate to district level
Empyrion Digital TH1 Bangkok is a data center project in Bang Na, Thailand, operated by Empyrion Digital. It is under construction. It is planned for 20 MW of IT load.
Latest change on record: moved to under construction in May 2026.
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started
Next gate to watch: Tenant or own use.
Your call. Will it be built?
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.
Construction or financing is evidenced, or several independent signals agree. On record: named funder, committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.
AI workloads
StatusLikely
Operator states TH1 is purpose-built for hyperscaler and AI-driven demand and will accommodate liquid cooling (design intent, not deployed GPUs).
Access to AI chips
GradeNo US licence required
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Money at this site
Approved by a government investment agency, 2025-03THB 4.7bn (about US$138m)
An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.
Power supply
On-site solarEmpyrion Digital (on-site solar panels) · May 2026 Confirmedsource ↗
The groundbreaking release lists solar panels and vertical green walls among the design's environmental features. No size is given. · Design feature at groundbreaking, not yet built.
Water and cooling
CoolingHybrid air and liquid cooling Reportedsource ↗
Liquid cooling alongside traditional systems for high-density AI loads. No PUE or WUE figure given.