Huashao Data Valley (华韶数据谷) data center

Shaoguan, Guangdong, China · Shaoguan market · location approximate to city level

Huashao Data Valley (华韶数据谷) is a data center project in Shaoguan, China, operated by Guangdong Huashao Digital Intelligence Technology (广东华韶数智科技). It is operational. The operator has not published an IT load figure. It is planned for 50,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational in 2022. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Guangdong Huashao Digital Intelligence Technology (广东华韶数智科技)
Local developer
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Shaoguan holds 11 active projects with 200 MW of planned IT load between them, and Huashao Data Valley (华韶数据谷) has no published figure so it sits outside that ranking. Of those, 4 are operational, 1 is operational and expanding, 3 are under construction, 1 is being commissioned and 2 are announced only. No third party publishes a colocation vacancy rate for Shaoguan, and ArusGrid does not estimate one.

Huashao has 1 other in China tracked by ArusGrid, including Chongqing Huashao Intelligent Computing Center. It sits on the Huangshaping Innovation Park, Guanshaocheng (莞韶城黄沙坪创新园). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 is operational with a 2022 target; Phase 2, 19,992 standard racks is announced. The dated record runs from under construction on 23 September 2019 to operational in 2022. The money on record is CN¥6.5bn as of September 2019, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 13 May 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Phase 2 plans racks up to 40kW. Shaoguan officials (May 2026) list a Huashao 10,000-card cluster as in production.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published, target 2022
Phase 2, 19,992 standard racks · AnnouncedSize not published

Stage history

2019-09-23Under construction · m.21jingji.com
2022Operational · finance.sina.cn

Who is behind it

OperatorGuangdong Huashao Digital Intelligence Technology (广东华韶数智科技) · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2019-09CN¥6.5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Design and build contractor中建二局安装工程有限公司 · CNY 178m · Feb 2021 Reported source ↗
EPC for the phase 1 machine-room special works (机房专项工程) at Huashao Data Valley, Guanshaocheng phase 1, Wujiang district. Phase 1 builds 5,000 racks.
Land
Site262 mu · Apr 2022 Reported source ↗
Huashao Data Industrial Park in Shaoguan High-tech Zone, planned in three phases. Counterparty not disclosed.
Water and cooling
CoolingWater-cooled chillers · design PUE 1.248 Confirmed source ↗
Phase 2 equipment list includes chillers, precision air conditioners and a pump house. Phase 1 design PUE not above 1.292 (2020 review).

Sources checked 2026-10-19

  1. 又一地竞逐大数据中心!韶关华韶数据谷项目正式动工 (21世纪经济报道, 2019-09-24)
  2. 广东省能源局发布中国移动、腾讯、华韶数据谷三大数据中心项目节能审查意见 (搜狐, 2024-11-12)
  3. 稳坐华南"算力之城",粤北小城刷出全国存在感 (南方财经网, 2026-05-13)
  4. 广东省能源局关于华韶数据谷(韶关大数据智能产业创新谷)二期节能报告的审查意见 (广东省能源局, 2024-11-07)
  5. 广东省能源局关于华韶数据谷(韶关大数据智能产业创新谷)项目一期节能报告的审查意见 (广东省能源局, 2020-11-30)
  6. “东数西算”韶关数据中心集群将用上“全绿电” (中国能源报 (人民网), 2022-04-11)
  7. 1.78亿,公司中标华韶数据谷一期机房专项工程EPC工程 (中建二局安装工程有限公司 (2bmep.cscec.com), 2021-02-23)

More in Shaoguan

Also run by Huashao

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.