ArusGridProject
Directory › China › Qingyang › Suihong Qingyang Green Intelligent Digital Infrastructure Project (燧弘庆阳绿色智能数字基础设施项目)

Suihong Qingyang Green Intelligent Digital Infrastructure Project (燧弘庆阳绿色智能数字基础设施项目) data center

Qingyang (East Data West Computing industrial park), Gansu, China · Qingyang market · location approximate to city level

Also listed as 燧弘庆阳 and Suihong Qingyang.

Suihong Qingyang Green Intelligent Digital Infrastructure Project (燧弘庆阳绿色智能数字基础设施项目) is a data center project in Qingyang (East Data West Computing industrial park), China, operated by Gansu Suihong Green Computing (甘肃燧弘绿色算力有限公司), subsidiary of Xiamen Hongxin Electronics (300657.SZ). It has been announced and has not yet reached the land or permitting stage. The operator has not published an IT load figure. It is planned for 2,500 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as announced on 1 August 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Gansu Suihong Green Computing (甘肃燧弘绿色算力有限公司), subsidiary of Xiamen Hongxin Electronics (300657.SZ)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingyang holds 8 active projects with 395 MW of planned IT load between them, and Suihong Qingyang Green Intelligent Digital Infrastructure Project (燧弘庆阳绿色智能数字基础设施项目) has no published figure so it sits outside that ranking. Of those, 3 are operational and expanding, 4 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Qingyang, and ArusGrid does not estimate one.

It is the only Hongxin Electronics project ArusGrid tracks. It sits on the Suihong Qingyang campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 1 August 2025. The money on record is CN¥12.8bn as of August 2025, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 21 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

The project is an intelligent computing centre with 20kW cabinets and a 40,000P compute target.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2025-08-01Announced · finance.sina.com.cn

Who is behind it

OperatorGansu Suihong Green Computing (甘肃燧弘绿色算力有限公司), subsidiary of Xiamen Hongxin Electronics (300657.SZ) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-08CN¥12.8bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated byQingyang city · 500 mu · Aug 2025 Confirmed source ↗
Planned land of about 500 mu in the investment framework agreement; no land deal found.

Sources checked 2026-10-19

  1. 弘信电子拟共建燧弘庆阳绿色智能数字基础设施项目 总投资预计128亿元 (新浪财经, 2025-08-01)
  2. 投资128亿,算力超40000P!弘信电子拟在庆阳投建超大规模绿色智算中心 (新浪财经, 2025-08-05)
  3. 弘信电子2026年半年度报告 (深交所 (Hongxin Electronics filing), 2026-08-21)
  4. 黄土塬上“算”出广阔新天地 (中国城市报 (人民网), 2026-05-11)

More in Qingyang

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.