Google (Pearl Computing) Elmina Data Centre & Cloud Region

City of Elmina, Shah Alam, Selangor, Malaysia · Klang Valley market · location approximate to district level

Google (Pearl Computing) Elmina Data Centre & Cloud Region is a data center project in City of Elmina, Shah Alam, Malaysia, operated by Google (via Pearl Computing). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as expanding on 4 November 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operator
Google (via Pearl Computing)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

hyperscaler self-build 2024+ (AI-era)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Phase 1 (49 acres) · OperationalSize not published, target 2027
Phase 2 (77 acres, RM5.6bn) · Under constructionSize not published, target 2027

Stage history

2026-11-04Expanding · googlecloudpresscorner.com

Who is behind it

OperatorGoogle (via Pearl Computing) · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerGoogle (Pearl Computing Malaysia Sdn Bhd) · confirmed

Full facility, 49 acres, 20-year lease, rent up to RM2bn · as of 2024-05-23

Sime Darby Property's Bursa announcement 'Agreement to Build & Lease a Hyperscale Data Centre and Associated Structures' names the lessee as Pearl Computing Malaysia Sdn Bhd, wholly owned by Raiden APAC Pte Ltd, Singapore, for about 49 acres at Elmina Business Park, 20 years plus two 5-year options. Google's ownership of Pearl Computing is stated in EcoWorld's later Bursa filing ('an affiliate of Google') and by DCD; Gamuda's RM1.74bn award release names the same lessee.

Source · Agreement to Build & Lease a Hyperscale Data Centre and Associated Structures (Sime Darby Property Berhad (Bursa announcement), 2024-05-23)

Source · Gamuda wins RM1.74 bil job to build Sime Darby Property's hyperscale data centre at Elmina Business Park (Gamuda Berhad, 2024-05-24)

Platform deals that include it

Google Malaysia program
Country programme, 2024-05
US$2.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

Build-to-suit lease on record, grade ANo per kW figure

Sime Darby Property build-and-lease to Pearl Computing (Google), RM2bn over the first 20 years, two 5-year options Electricity excluded. As of 2024-05. Sime Darby Property, 2024-05-23

About RM100m a year on a build cost reported at about RM815m, a 12 percent gross yield on cost. Shell rent, MW not disclosed. Own-use site, so no colocation price applies.

An own-use build. No colocation price applies.

Project team
Core and shell builderGamuda Engineering · RM815m (≈US$183m) · May 2024 Confirmed source ↗
Phase 1 construction and commissioning
Core and shell builderIJM Construction · RM1.26bn (≈US$284m) · Oct 2025 Confirmed source ↗
Phase 2 core and shell, package 1
Core and shell builderIJM Construction · RM658m (≈US$148m) · Apr 2026 Reported source ↗
Package 2 main building works
Civil and structural worksAsteel (Sarawak) Sdn Bhd (with Sarnatec Sdn Bhd) · RM61.2m (≈US$14m) · Aug 2024 Reported source ↗
Roof and wall cladding, EBP1A hyperscale DC, subcontract to Gamuda; 15 months from 2024-08-12
Mechanical and electrical worksGamuda Engineering · RM928.6m (≈US$209m) · May 2024 Confirmed source ↗
Phase 1 M&E fit-out
Mechanical and electrical worksIJM Construction · RM873.9m (≈US$197m) · Oct 2025 Confirmed source ↗
Phase 2 M&E fit-out, package 1
Land
LandlordSime Darby Property · 126 acres · leased · Dec 2024 Confirmed source ↗
20 years plus two 5-year options; 49 acres Phase 1 plus 77 acres Phase 2; Phase 2 rent estimated at RM5.6bn over the initial term
Power supply
Dedicated substationDec 2025 Reported source ↗
On-site substation under construction; Ph1 ~100MW, Ph2 200-250MW · Applies to the whole campus.
Renewable power dealTotalEnergies / MK Land (via TNB grid) · 20 MW · Dec 2025 Confirmed source ↗
Solar, 21 years, Corporate Green Power Programme, construction from early 2026 · Covers Google's Malaysia data centres; Elmina not named · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
WaterMains drinking water · Air Selangor Reported source ↗
CoolingWater-cooled chillers Reported source ↗
Google states water cooling for this site
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTECO Electric & Machinery (via NCL Energy) · Mechanical and electrical works · RM170m (≈US$38m) · Jul 2025 source ↗
This project is one of 2 that fit. The other is Google Elmina 2 (SDP EBP Asset II).
UnconfirmedGamuda, IJM and Sunway Construction · Bidder · Jul 2025 source ↗
This project is one of 2 that fit. The other is Google (Pearl Computing) Port Dickson.
UnconfirmedSunway Construction Sdn Bhd · Main contractor · RM747.8m (≈US$168m) · Mar 2024 source ↗
This project is one of 4 that fit. The others are AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley), EdgeConneX Cyberjaya Campus, Vantage KUL2.

Sources

  1. simedarbyproperty.com
  2. datacenterdynamics.com
  3. mingtiandi.com
  4. Google's Elmina data centre to operate within nine months (Media Selangor, 2026-08-20)
  5. From township builder to AI landlord: Sime Darby Property resets game plan, aims for data centre dominance (EdgeProp Malaysia, 2026-02-24)
  6. Google Announces Digital Infrastructure Expansion, Local Jobs, Water Replenishment, and Clean Energy Initiatives with US$15 Billion Malaysia Investment (Google Cloud Press Corner, 2026-11-04)
  7. Google's US$15 Bln Investment To Contribute US$1.1 Bln Annually To GDP During Construction (Bernama, 2026-11-04)

Same campus, Elmina Business Park

More in Klang Valley

Also run by Google

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com