Gamuda's Bursa Malaysia announcement names Pearl Computing Malaysia Sdn Bhd as buyer of about 389 acres at Port Dickson with a RM1.01 billion enabling works contract; The Edge identifies the buyer as a Google affiliate. The SPV is named in an exchange filing at this site.
Project team
Design and build contractorGamuda Engineering Sdn Bhd · RM1.72bn (≈US$387m) · Apr 2026 Inferred by ArusGrid source ↗ Site infrastructure, core and shell and MEP fit-out; 2Q2026 to 1Q2028
Why we think so. Filing hides a US-headquartered tech client in Port Dickson; Google's Pearl Computing bought Gamuda's 389-acre Port Dickson site in May 2025, our only Port Dickson project.
Design and build contractorGamuda Engineering Sdn Bhd · RM1.71bn (≈US$385m) · Aug 2026 Inferred by ArusGrid source ↗ Second single-storey hyperscale DC: site infra, core and shell, MEP; 3Q2026 to 2Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.79bn (≈US$403m) · Aug 2026 Inferred by ArusGrid source ↗ Third award, facility A: single-storey hyperscale DC incl. site infra, core and shell, MEP; 4Q2026 to 3Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.78bn (≈US$401m) · Aug 2026 Inferred by ArusGrid source ↗ Third award, facility B: single-storey hyperscale DC; complete 4Q2028
Mechanical and electrical worksKinergy Advancement Bhd · RM47.5m · Oct 2026 Inferred by ArusGrid source ↗ Electrical works for the core and shell under Gamuda Engineering: HT and LV distribution, substations, switchgear, transformers and UPS, at Bandar Spring Hill, Port Dickson.
Why we think so. The filing names Gamuda Engineering as the main contractor and Bandar Spring Hill, Port Dickson as the site, but not the end client. Gamuda sold its 389-acre Port Dickson parcel to Google's Pearl Computing, and Kenanga says all Gamuda's Port Dickson packages come from the same developer on this campus.
Mechanical and electrical worksQudotech Sdn Bhd · RM39.7m · Oct 2026 Inferred by ArusGrid source ↗ Subcontract from Gamuda Engineering for the cold water, rainwater harvesting, water reticulation, fire hydrant and sanitary systems at a hyperscale data centre in Bandar Spring Hill, Port Dickson. Works 14 Aug 2026 to 22 Oct 2027.
Why we think so. The Bursa filing names Gamuda Engineering and a hyperscale data centre at Bandar Spring Hill, Port Dickson but not the client. Gamuda's hyperscale builds there are the Pearl Computing (Google) campus. The only other Gamuda-linked DC at Springhill found (Gerbil, for Mujur Minat) was due to finish in Aug 2025, so the Aug 2026 start fits this campus only.
Mechanical and electrical worksISF Group Bhd · RM83.2m · Nov 2026 Inferred by ArusGrid source ↗ Four contracts: cold water, rainwater harvesting, water reticulation and sanitary systems (about RM73.3m) and external sewerage works (about RM9.9m) for a hyperscale data centre in Port Dickson. Completion in stages from Nov 2026 to Jul 2028.
Why we think so. The filing gives a hyperscale data centre in Port Dickson under an unnamed Malaysian civil and building group. Google's Pearl Computing campus at Bandar Springhill, built by Gamuda, is the only Port Dickson data centre under construction in our index. Tera's Port Dickson site is still at announcement stage.
Utility infrastructureGamuda DC Infrastructure Sdn Bhd · RM1bn (≈US$225m) · May 2025 Reported source ↗ Enabling works bundled with land sale: earthworks, external infra, 65 MLD water treatment plant, off-river storage
Land
Land sellerGamuda DC Infrastructure Sdn Bhd (Gamuda Bhd) · 389 acres · RM455.23m (≈US$102m) · freehold · May 2025 Reported source ↗ Sold to Pearl Computing Malaysia with ~RM1bn enabling works; SPA 2025-05-02
Land sellerWest Synergy Sdn Bhd (60% MUI Properties) · 157.71 ha · RM424.4m (≈US$96m) · freehold · Dec 2024 Reported source ↗ Upstream sale to Gamuda DC Infrastructure (Jan 2025) before on-sale to Pearl Computing; agricultural land, Springhill
Water and cooling
WaterIndustrial raw water · Gamuda-built water treatment plant, to be handed to Syarikat Air Negeri Sembilan · 65 MLD Reported source ↗ 65 MLD WTP with off-river storage; ~75% of output for the DC campus, 25% to state supply
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTRC Construction Sdn Bhd · Utility infrastructure · RM149.98m (≈US$34m) · Aug 2026 source ↗ This project is one of 2 that fit. The other is Google (Pearl Computing) Puncak Alam.
UnconfirmedGamuda, IJM and Sunway Construction · Bidder · Jul 2025 source ↗ This project is one of 2 that fit. The other is Google (Pearl Computing) Elmina Data Centre & Cloud Region.