ArusGridProject
Directory › Malaysia › Google (Pearl Computing) Port Dickson

Google (Pearl Computing) Port Dickson

Port Dickson (Bandar Springhill), Negeri Sembilan, Malaysia · Klang Valley market · location approximate to district level

Google (Pearl Computing) Port Dickson is a data center project in Port Dickson (Bandar Springhill), Malaysia, operated by Google (Pearl Computing Malaysia). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Google (Pearl Computing Malaysia)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

hyperscaler self-build initiated 2025-26 (AI-era design)

Phases

Building 1 (Gamuda RM1.72bn, Apr 2026) · Under constructionSize not published, target 2028
Building 2 (Gamuda RM1.71bn, Aug 2026) · AnnouncedSize not published, target 2028
Building 3 (Gamuda RM1.79bn, Aug 2026, start 4Q2026) · AnnouncedSize not published, target 2028
Building 4 (Gamuda RM1.78bn, Aug 2026, start 4Q2026) · AnnouncedSize not published, target 2028

Who is behind it

OperatorGoogle (Pearl Computing Malaysia) · Hyperscaler self-build

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-04RM1,720m (about US$408m)
Who builds it
Design and build contractorGamuda Engineering Sdn Bhd · RM1.72bn (≈US$387m) · Apr 2026 Inferred by ArusGrid source ↗
Site infrastructure, core and shell and MEP fit-out; 2Q2026 to 1Q2028
Why we think so. Filing hides a US-headquartered tech client in Port Dickson; Google's Pearl Computing bought Gamuda's 389-acre Port Dickson site in May 2025, our only Port Dickson project.
Design and build contractorGamuda Engineering Sdn Bhd · RM1.71bn (≈US$385m) · Aug 2026 Inferred by ArusGrid source ↗
Second single-storey hyperscale DC: site infra, core and shell, MEP; 3Q2026 to 2Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.79bn (≈US$403m) · Aug 2026 Inferred by ArusGrid source ↗
Third award, facility A: single-storey hyperscale DC incl. site infra, core and shell, MEP; 4Q2026 to 3Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.78bn (≈US$401m) · Aug 2026 Inferred by ArusGrid source ↗
Third award, facility B: single-storey hyperscale DC; complete 4Q2028
Utility infrastructureGamuda DC Infrastructure Sdn Bhd · RM1bn (≈US$225m) · May 2025 Reported source ↗
Enabling works bundled with land sale: earthworks, external infra, 65 MLD water treatment plant, off-river storage
Land
Land sellerGamuda DC Infrastructure Sdn Bhd (Gamuda Bhd) · 389 acres · RM455.23m (≈US$102m) · freehold · May 2025 Reported source ↗
Sold to Pearl Computing Malaysia with ~RM1bn enabling works; SPA 2025-05-02
Land sellerWest Synergy Sdn Bhd (60% MUI Properties) · 157.71 ha · RM424.4m (≈US$96m) · freehold · Dec 2024 Reported source ↗
Upstream sale to Gamuda DC Infrastructure (Jan 2025) before on-sale to Pearl Computing; agricultural land, Springhill
Water and cooling
WaterIndustrial raw water · Gamuda-built water treatment plant, to be handed to Syarikat Air Negeri Sembilan · 65 MLD Reported source ↗
65 MLD WTP with off-river storage; ~75% of output for the DC campus, 25% to state supply
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTRC Construction Sdn Bhd · Utility infrastructure · RM149.98m (≈US$34m) · Aug 2026 source ↗
This project is one of 2 that fit. The other is Google (Pearl Computing) Puncak Alam.
UnconfirmedGamuda, IJM and Sunway Construction · Bidder · Jul 2025 source ↗
This project is one of 2 that fit. The other is Google (Pearl Computing) Elmina Data Centre & Cloud Region.

Sources checked 2026-09-11

  1. theedgemalaysia.com
  2. datacenterdynamics.com
  3. businesstoday.com.my
  4. Gamuda bags RM1.71bil data centre job in Port Dickson (The Star, 2026-08-05)
  5. Gamuda secures RM3.57b data centre jobs; Mida's Tengku Zafrul highlights Malaysia's RM218.5b approved investments (EdgeProp, 2026-08-31)
  6. TRC Synergy secures RM150mil hyperscale data centre contract (The Star, 2026-09-08)

More in Klang Valley

Also run by Google

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.