No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.
Who builds it
Design and build contractorGamuda Engineering Sdn Bhd · RM1.72bn (≈US$387m) · Apr 2026 Inferred by ArusGrid source ↗ Site infrastructure, core and shell and MEP fit-out; 2Q2026 to 1Q2028
Why we think so. Filing hides a US-headquartered tech client in Port Dickson; Google's Pearl Computing bought Gamuda's 389-acre Port Dickson site in May 2025, our only Port Dickson project.
Design and build contractorGamuda Engineering Sdn Bhd · RM1.71bn (≈US$385m) · Aug 2026 Inferred by ArusGrid source ↗ Second single-storey hyperscale DC: site infra, core and shell, MEP; 3Q2026 to 2Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.79bn (≈US$403m) · Aug 2026 Inferred by ArusGrid source ↗ Third award, facility A: single-storey hyperscale DC incl. site infra, core and shell, MEP; 4Q2026 to 3Q2028
Design and build contractorGamuda Engineering Sdn Bhd · RM1.78bn (≈US$401m) · Aug 2026 Inferred by ArusGrid source ↗ Third award, facility B: single-storey hyperscale DC; complete 4Q2028
Utility infrastructureGamuda DC Infrastructure Sdn Bhd · RM1bn (≈US$225m) · May 2025 Reported source ↗ Enabling works bundled with land sale: earthworks, external infra, 65 MLD water treatment plant, off-river storage
Land
Land sellerGamuda DC Infrastructure Sdn Bhd (Gamuda Bhd) · 389 acres · RM455.23m (≈US$102m) · freehold · May 2025 Reported source ↗ Sold to Pearl Computing Malaysia with ~RM1bn enabling works; SPA 2025-05-02
Land sellerWest Synergy Sdn Bhd (60% MUI Properties) · 157.71 ha · RM424.4m (≈US$96m) · freehold · Dec 2024 Reported source ↗ Upstream sale to Gamuda DC Infrastructure (Jan 2025) before on-sale to Pearl Computing; agricultural land, Springhill
Water and cooling
WaterIndustrial raw water · Gamuda-built water treatment plant, to be handed to Syarikat Air Negeri Sembilan · 65 MLD Reported source ↗ 65 MLD WTP with off-river storage; ~75% of output for the DC campus, 25% to state supply
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTRC Construction Sdn Bhd · Utility infrastructure · RM149.98m (≈US$34m) · Aug 2026 source ↗ This project is one of 2 that fit. The other is Google (Pearl Computing) Puncak Alam.
UnconfirmedGamuda, IJM and Sunway Construction · Bidder · Jul 2025 source ↗ This project is one of 2 that fit. The other is Google (Pearl Computing) Elmina Data Centre & Cloud Region.