Google Singapore campus (Jurong West / Lok Yang)

Singapore, Singapore · Singapore market

Google Singapore campus (Jurong West / Lok Yang) is a data center project in Singapore, operated by Google. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as operational on 3 June 2024.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operator
Google
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: disclosed client (confirmed), committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

hyperscaler self-build (GCP/TPU plausible)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

DC1 · OperationalSize not published, target 2014
DC2 · OperationalSize not published, target 2015
DC3 · OperationalSize not published, target 2022
DC4 · OperationalSize not published, target 2024
Lok Yang build · Under constructionSize not published

Stage history

2024-06-03Operational · googlecloudpresscorner.com

Who is behind it

OperatorGoogle · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerGoogle (own use / GCP) · confirmed
Runs compute here · enterpriseDBS Bank · reported, unconfirmed

Enterprise AI workloads with Singapore data residency on Google Cloud's Singapore region · as of 2025-08-28

Google Cloud's own release names DBS among customers whose AI workloads run with expanded Singapore data residency, meaning machine-learning processing stays inside Singapore. Google's Singapore region (asia-southeast1) is served from its Jurong West self-build campus, the only Google data centre in the country; the release does not name the building.

Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)

Runs compute here · governmentGovTech Singapore (with CSIT, HTX) · reported, unconfirmed

Public-sector Gemini and Vertex AI workloads with Singapore data residency; CSIT, HTX and NUS also named · as of 2025-08-28

Same Google Cloud release names GovTech, CSIT, HTX and NUS as Singapore public-sector users of Gemini services with in-country ML processing on the Singapore region, which Google serves from Jurong West. Building not named by Google.

Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)

Source · Google Cloud expands Gemini AI, strengthens Singapore focus (Singapore EDB, 2025-08-28)

Money at this site

Announced investment, 2024-06US$5bn

The figure covers several facilities.

It includes GPUs and IT hardware, so it is not comparable with building cost.

Power supply
Grid supplySingapore grid (supplier not named) · 2025 Confirmed source ↗
Google reports 5% carbon-free energy for its Singapore data centres in 2025. All of it came from the grid mix and 0% from contracted clean energy. · Applies to the whole campus.
Water and cooling
Cooling Confirmed source ↗
Google reports annual PUE of 1.12 for its first Singapore facility and 1.14 for its second facility in 2025. These are measured figures, not design PUE.

Sources

  1. googlecloudpresscorner.com
  2. baxtel.com
  3. datacentermap.com
  4. Google 2026 Environmental Report (Google, 2026-06-30)
  5. Growing the internet while reducing energy consumption (Google)

More in Singapore

Also run by Google

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com