Epoch Digital EMY1 data center

Iskandar Puteri (Gelang Patah), Johor, Malaysia · Johor market · location approximate to district level

Epoch Digital EMY1 is a data center project in Iskandar Puteri (Gelang Patah), Malaysia, operated by Epoch Digital (Actis platform). It is under construction. It is planned for 120 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
Not disclosed
Operator
Epoch Digital (Actis platform)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

120MW modern greenfield (2023+)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Who is behind it

OperatorEpoch Digital (Actis platform) · Colocation
Funder, EquityActis

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$1.2bn to US$1.7bn

No figure has been announced. This range is 120 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources

  1. epochdigital.org
  2. datacentermap.com
  3. datacenterdynamics.com
  4. Actis Launches Asia Data Centre Platform With 200MW Project Portfolio (Mingtiandi, 2024-06-21)
  5. Actis seeks investments for Asia data centres portfolio (Infralogic (ION Analytics), 2024-08-23)
  6. Epoch Digital (Actis)
  7. /C O R R E C T I O N -- Empyrion Digital/ (PR Newswire (via Utusan Malaysia), 2025-12-09)

More in Johor

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com