ArusGridOperator
Directory › ByteDance › China

ByteDance data centers in China

China · dataset updated 2026-10-18

ArusGrid tracks 4 active data center projects operated by ByteDance in China, with 7 MW of planned IT load. Of these, 2 are at the land and permitting stage and 2 are announced only.

Its China projects sit in Zhongwei, Horinger and Hohhot, Ulanqab and Wuhu. The largest is Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1 at 7.47 MW, at the land and permitting stage. Disclosed tenants in China are ByteDance. Outside China, ByteDance has 1 active project on record in Thailand.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1ZhongweiLand and permitting7.47undisclosedVolcano Engine (火山引擎), permit holder 中卫朔方星河科技有限公司Likely
Volcano Engine GW-scale Park, HohhotHohhotAnnouncednone publishedundisclosedVolcano Engine (火山引擎, ByteDance)Likely
Volcano Engine GW-scale Computing Center, UlanqabUlanqabAnnouncednone publishedundisclosedVolcano Engine (火山引擎, ByteDance)Likely
Volcano Engine YRD Computing Centre (火山引擎长三角算力中心)WuhuLand and permitting21,824 racks *undisclosedVolcano Engine (火山引擎), via Wuhu Jiangdong Mingyi Technology (芜湖江东名邑科技有限公司)Likely

Markets

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.