G-Campus Hoa Lac (High-Tech & Data Centre Complex) is a data center project in Hoa Lac, Vietnam, operated by G-Group Technology. It is at the land and permitting stage. It is planned for 20 MW of IT load.
Latest change on record: entered the record as land and permitting on 29 June 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.
Construction or financing is evidenced, or several independent signals agree. On record: named funder, committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.
Dated source states the phase-1 20MW IT load uses DIRECT-TO-CHIP LIQUID COOLING for AI/HPC systems (Znews / VietnamNet / Bao Dau Tu, 29 Jun 2026). That meets our 'confirmed' bar.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria.
Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source
Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.
The figure covers the whole campus.