ArusGrid tracks 4 active data center projects in Hoa Lac, Vietnam, with 50 MW of planned IT load. Of these, 3 are operational and 1 is at the land and permitting stage. Operators have disclosed 30 MW actually running.
Hoa Lac sits in the Hanoi metro market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is Viettel IDC Hoa Lac at 30 MW, operational. The operators with the most planned capacity here are Viettel (30 MW across 1 project), G-Group (20 MW across 1 project) and Ministry of Public Security (1 project).
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Viettel IDC Hoa Lac | Hoa Lac | Operational | 30 * | 30 | Viettel IDC (Viettel Group) | Confirmed |
| G-Campus Hoa Lac (High-Tech & Data Centre Complex) | Hoa Lac | Land and permitting | 20 | undisclosed | G-Group Technology | Confirmed |
| National Data Center No.1 | Hoa Lac | Operational | none published | undisclosed | Ministry of Public Security (National Data Center) | No signal either way |
| VNPT IDC Hoa Lac | Hoa Lac | Operational | none published | undisclosed | VNPT (VNPT IDC) | Confirmed |