ArusGrid tracks 5 active data center projects in Hanoi metro, Vietnam, with 110 MW of planned IT load. Of these, 3 are operational, 1 is under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 60 MW and operational sites for 30 MW of planned capacity. Operators have disclosed 30 MW actually running, a figure most of them do not publish.
The largest project is Viettel An Khanh Data Center at 60 MW, under construction. The operators with the most planned capacity here are Viettel (90 MW across 2 projects), G-Group (20 MW across 1 project) and Ministry of Public Security (1 project). No third party publishes a colocation vacancy rate for Hanoi metro, and ArusGrid does not estimate one.
Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Viettel An Khanh Data Center | An Khanh (fmr Hoai Duc) | Under construction | 60 | undisclosed | Viettel IDC (Viettel Group) | Likely |
| Viettel IDC Hoa Lac | Hoa Lac | Operational | 30 * | 30 | Viettel IDC (Viettel Group) | Confirmed |
| G-Campus Hoa Lac (High-Tech & Data Centre Complex) | Hoa Lac | Land and permitting | 20 | undisclosed | G-Group Technology | Confirmed |
| National Data Center No.1 | Hoa Lac | Operational | none published | undisclosed | Ministry of Public Security (National Data Center) | No signal either way |
| VNPT IDC Hoa Lac | Hoa Lac | Operational | none published | undisclosed | VNPT (VNPT IDC) | Confirmed |