Viettel An Khanh Data Center

An Khanh (fmr Hoai Duc), Hanoi, Vietnam · Hanoi metro market · location approximate to district level

Viettel An Khanh Data Center is a data center project in An Khanh (fmr Hoai Duc), Vietnam, operated by Viettel IDC (Viettel Group). It is under construction. It is planned for 60 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
60 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Viettel IDC (Viettel Group)
Telco
AI workloads
Likely
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Viettel states the design integrates Viettel-developed AI, 'advanced cooling technology', and targets AI deployment at national scale; slated to become Viettel's second hyperscale DC by 2030. Cooling type is not specified, so 'likely' not 'confirmed'.

Phases

Phase 1 · Under constructionSize not published, target 2027

Who is behind it

OperatorViettel IDC (Viettel Group) · Telco
Funder, EquityViettel Group

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025-08VND 17,500bn (about US$665m)

Platform deals that include it

Viettel 5x AI Factory data centre programme 2026-2030
Country programme, 2026-04
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Who builds it
Main contractorHop Luc Construction JSC (Xây dựng Hợp Lực) · VND 730.81bn (≈US$29m) · Oct 2025 Reported source ↗
Phase 1 construction and equipment supply and installation, excluding mechanical and DC management systems; 260 days
Mechanical and electrical worksR.E.E Mechanical & Electrical Engineering JSC (REE M&E) · VND 786.41bn (≈US$31m) · Feb 2026 Reported source ↗
Phase 1 machine-room mechanical and electrical systems, supply and installation; 260 days

Sources checked 2026-09-11

  1. vnexpress.net
  2. theinvestor.vn
  3. vneconomy.vn
  4. Viettel: 3.487 tỷ đồng đầu tư xây dựng Tổng trạm An Khánh (Báo Đấu thầu, 2025-09-15)
  5. Xây dựng Hợp lực trúng gói thầu 730 tỷ đồng xây Tổng trạm An Khánh cho Viettel (Báo Đấu thầu, 2025-10-14)
  6. 5 nhà thầu cạnh tranh gói 1.053 tỷ đồng tại Dự án Tổng trạm An Khánh của Viettel (Báo Đấu thầu, 2025-10-22)

More in Hanoi metro

Also run by Viettel

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.