EdgeConneX Bukit Jalil is a data center project in Bukit Jalil, Malaysia, operated by EdgeConneX. It is under construction. It is planned for 67 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
67 MW
Running now
Not disclosed
Operators rarely publish this
Operator
EdgeConneX
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Phases

Initial · Under construction22 MW, target 2026
Full build · Announced67 MW

Who is behind it

OperatorEdgeConneX · Colocation
Funder, EquityEQT

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

EdgeConneX Malaysia program
Country programme, 2023-09
US$2.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Power supply
Dedicated substation132kV · Mar 2026 Confirmed source ↗
132kV substation; 22.4MW growing to 67MW · Applies to the whole campus.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM6.59m (≈US$2m) · Sep 2024 source ↗
This project is one of 3 that fit. The others are Bridge Data Centres MY03, MRCB / Perintis Akal AI Data Centre (Bukit Jalil).

Sources checked 2026-09-11

  1. edgeconnex.com
  2. datacentermap.com

Same campus, MRANTI Park Bukit Jalil

More in Klang Valley

Also run by EdgeConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.