ArusGridProject
Directory › Malaysia › Infinaxis CDC1

Infinaxis CDC1

Cyberjaya, Selangor, Malaysia · Klang Valley market · location approximate to city level

Infinaxis CDC1 is a data center project in Cyberjaya, Malaysia, operated by Infinaxis (Gaw Capital / A3 Capital JV). It is operational. It is planned for 12 MW of IT load.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
12 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Infinaxis (Gaw Capital / A3 Capital JV)
Joint venture
AI workloads
Confirmed
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

up to 80kW/rack design

Phases

Phase 1 · Operational12 MW, target 2026

Stage history

2026-01-20Operational · english.cscec.com

Who is behind it

OperatorInfinaxis (Gaw Capital / A3 Capital JV) · Joint venture
Funder, EquityGaw Capital Partners
Funder, Joint venture partnerA3 Capital
Client, reported, unconfirmedUnnamed (>80% Ph1 pre-committed)
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. gawcapital.com
  2. datacenterdynamics.com
  3. CSCEC-built Infinaxis Data Center project in Malaysia enters operation (China State Construction Engineering Corporation, 2026-01-20)

More in Klang Valley

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.