Stratus Technology (ZData) CPGC Rayong data center

CPGC Industrial Estate, Rayong, Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to city level

Stratus Technology (ZData) CPGC Rayong is a data center project in CPGC Industrial Estate, Rayong, Thailand, operated by Stratus Technology. It is at the land and permitting stage. It is planned for 203 MW of IT load.

Latest change on record: entered the record as land and permitting on 27 June 2025.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
203 MW
Running now
Not disclosed
Operator
Stratus Technology
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: named funder, committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

>=100MW modern greenfield announced 2025 by a Chinese hyperscale platform; Tier III design stated, no density disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2025-06-27Land and permitting · osos.boi.go.th

Who is behind it

OperatorStratus Technology · Colocation
Funder, EquityCNISP Group
Funder, EquityHongShan Capital
Funder, EquityEastern Bell Capital

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2025-06THB 23.7bn (about US$727m)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Land
Industrial estateCPGC Industrial Estate (Charoen Pokphand Group) · Jun 2025 Reported source ↗

Sources

  1. datacenterdynamics.com
  2. mingtiandi.com
  3. datacentermap.com
  4. Thailand data centre licences top 1GW of power (ASEAN NOW, 2026-09-08)
  5. Thailand BOI Approves 28.6 Billion Baht in New Investments; Adds Incentives for the Use of Local Content in Electric Vehicle and E&E Manufacturing (Thailand Board of Investment, 2025-06-27)
  6. เปิดพิกัด 65 ดาต้าเซ็นเตอร์ กรุงเทพฯ เยอะสุด 45 แห่ง ตจว. กระจุกตัวพื้นที่ EEC (Naewna, 2026-09-04)