ZDATA Johor GP3

Gelang Patah, Johor, Malaysia · Johor market · location approximate to city level

ZDATA Johor GP3 is a data center project in Gelang Patah, Malaysia, operated by ZDATA Technologies (China). It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
ZDATA Technologies (China)
Colocation
AI workloads
Likely
Evidence grade
Thin

How well evidenced is it

The announcement stands alone, or the project is on hold. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

GPU/computility operator

Who is behind it

OperatorZDATA Technologies (China) · Colocation

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2024-10RM240m (about US$55m)

The figure covers land only.

Land
Land sellerTropicana Corp Bhd (Tropicana Firstwide Sdn Bhd) · 38 acres · RM240m (≈US$54m) · Oct 2024 Confirmed source ↗
Buyer Computility Technology (Malaysia) Sdn Bhd (ZData Technologies); Gelang Patah; Tropicana also acts as site developer
Water and cooling
WaterRecycled wastewater · IWK treated effluent via Johor Special Water; plant by Ocned Water Technology (Computility Technology) · 4 MLD Reported source ↗
Designed for 100% reclaimed water; Ph1 plant opened Mar 2026, Ph2 end-2027, four plants planned; 57% potable saving
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM12m (≈US$3m) · Jul 2026 source ↗
This project is one of 2 that fit. The other is Digital Hyperspace Johor.

Sources checked 2026-07-12

  1. datacentermap.com

More in Johor

Also run by ZDATA Technologies (China)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.