Yotta NM2 data center

Panvel, Maharashtra, India · Mumbai metro market · location approximate to district level

Yotta NM2 is a data center project in Panvel, India, operated by Yotta Data Services. It is under construction. The published capacity figure is 80 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as under construction on 11 September 2026. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
80 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Yotta Data Services
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated

Where it sits

Mumbai metro holds 25 active projects with 2,020 MW of planned IT load between them, and Yotta NM2 ranks 9th by planned capacity. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 6 are at the land and permitting stage and 3 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

Yotta has 4 others in India tracked by ArusGrid, including Yotta D4, Yotta D2 and Yotta NM1. It sits on the Yotta Panvel (Hiranandani Fortune City) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 11 September 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 17 September 2026, and last checked the record on 2 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

CEO Sunil Gupta told Moneycontrol on 2026-09-11 that NM2 will house 40,000 Nvidia GB300 GPUs for Yotta's own Shakti Cloud, with the building currently being fitted out.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

NM2 · Under construction80 MW, target 2027

Stage history

2026-09-11Under construction · techtimes.com

Who is behind it

OperatorYotta Data Services · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. India's Yotta Plans 80,000 Vera Rubin GPUs (Tech Times, 2026-09-12)
  2. Yotta Bets $12B on 80,000 Nvidia Vera Rubin GPUs (Shattered, 2026-09-17)

More in Mumbai metro

Also run by Yotta

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.