Yotta D4 is a data center project in Greater Noida, India, operated by Yotta Data Services. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 120 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as announced on 27 August 2026. Record last checked against its sources on 2 October 2026.
NCR holds 12 active projects with 1,055 MW of planned IT load between them, and Yotta D4 ranks third by planned capacity. Of those, 4 are operational, 2 are operational and expanding, 2 are under construction and 4 are announced only. Published colocation vacancy in NCR was 44% as of June 2025. Vacancy excludes hyperscaler self-build.
Yotta has 4 others in India tracked by ArusGrid, including Yotta NM2, Yotta D2 and Yotta NM1. It sits on the Yotta Greater Noida campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 27 August 2026. The money on record is US$750m as of August 2026, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 12 September 2026, and last checked the record on 2 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
CEO Sunil Gupta told Business Standard the 120 MW D4 building will host 50,000 Vera Rubin GPUs with go live May to August 2027. Techtimes quoting a Moneycontrol interview at Global Fintech Fest Sep 2026 cites 40,000 Vera Rubin chips and the CEO saying construction is starting.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
All projects in NCR · All projects in India · All Yotta projects · All projects announced only · Full directory