How well evidenced is it
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusLikely
Part of a campus STT says is engineered to host Nvidia Vera Rubin / Vera Rubin Ultra GPU systems (Jun 2026); on-site HV substation.
Who is behind it
OperatorSTT GDC Indonesia · Joint venture
Funder, Joint venture partnerTriputra Group
Funder, EquityKKR
Funder, EquitySingtel
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.
Platform deals that include it
KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01US$5.1bn
STT GDC Indonesia IDR 8.8tn (~US$500M) dual-currency facility
Debt, 2026-06US$500m
Platform capital spans several sites. It is never added to this project's own figure.
Land
Industrial estateGreenland International Industrial Centre (GIIC, Puradelta Lestari / DMAS estate) · Jun 2026 Reported source ↗ Campus-wide (STT Jakarta 1-9, up to 360MW) sits in GIIC; area and terms not disclosed
Water and cooling
CoolingWater-cooled chillers · design PUE <1.30 Confirmed source ↗ N+1 water-cooled chillers, cooling towers, fan wall units (facility factsheet)