STT Fairview (STT GDC 'Polaris' campus)

Quezon City, Metro Manila, Philippines · Greater Manila market · location approximate to district level

STT Fairview (STT GDC 'Polaris' campus) is a data center project in Quezon City, Philippines, operated by STT GDC Philippines. It is operational. It is planned for 124 MW of IT load. The operator reports 32 MW running.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
124 MW
Running now
32 MW
Operators rarely publish this
Operator
STT GDC Philippines
Joint venture
AI workloads
Likely
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

124MW greenfield campus; STT GDC states the buildings are engineered to house liquid-cooled solutions on customer request (DCD, May 2023); marketed as the country's largest AI-ready campus; hyperscaler anchor tenant reported (Inquirer, May 2025). No dated source for actual liquid cooling installed or GPUs deployed, so 'likely' not 'confirmed'.

Phases

Fairview 1 (built out) · Operational32 MW, target 2026
Fairview 2 · Announced32 MW, target 2027

Stage history

2026-08-04Operational · insiderph.com

Who is behind it

OperatorSTT GDC Philippines · Joint venture
Funder, Joint venture partnerGlobe Telecom
Funder, Joint venture partnerAyala Corporation
Funder, EquityKKR
Funder, EquitySingtel
Client, reported, unconfirmedUndisclosed global cloud service provider (anchor tenant)

Money at this site

Announced investment, 2025-05US$1bn

The figure covers the whole campus.

Platform deals that include it

KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01
US$5.1bn
STT GDC Philippines x MPower 40.5MW clean power supply
Power deal
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Who builds it
Main contractorFirst Balfour-Leighton Asia JV · Nov 2023 Confirmed source ↗
Phase 1 general contractor (civil, structural, architectural, MEPF)
Power supply
Dedicated substationMeralco · 115kV · Feb 2025 Reported source ↗
Dual-feed Polaris switching station, PHP220m, built with MIESCOR
Renewable power dealMPower (Meralco) · 40.5 MW · Apr 2026 Reported source ↗
10-year renewable supply shared with STT Cavite 2 · Applies to the whole campus.

Sources checked 2026-09-13

  1. datacenterdynamics.com
  2. business.inquirer.net
  3. bworldonline.com
  4. philstar.com
  5. datacenterdynamics.com
  6. meralcomain.s3.ap-southeast-1.amazonaws.com
  7. bworldonline.com
  8. pcij.org
  9. bworldonline.com
  10. bworldonline.com
  11. STT GDC explores more PHL sites for expansion (BusinessWorld, 2026-04-27)
  12. STT GDC scaling PH data center capacity to 128 MW (InsiderPH, 2026-08-04)
  13. KKR-Singtel Consortium Completes Acquisition of STTGDC; Company Launches Refreshed Global Brand for Next Phase of Growth (STT GDC via Access Newswire, 2026-09-01)
  14. Beyond GCash: Globe pinpoints its next big multi-billion-peso growth engine (Manila Bulletin, 2026-08-10)

More in Greater Manila

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.