NeutraDC Hyperscale DC Cikarang (HDC Cikarang) is a data center project in Cikarang, Bekasi, Indonesia, operated by NeutraDC (Telkom Data Ekosistem). It is operational and expanding. It is planned for 120 MW of IT load.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Operator markets it as an 'AI-ready data center' for hyperscalers and large enterprises; 120MW IT-load campus at GIIC Deltamas with 2N power houses. No rack-density/cooling disclosure.
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.