DCI H1 Campus (JK1 to JK6), Cibitung is a data center project in Cibitung, Bekasi, Indonesia, operated by DCI Indonesia. It is operational and expanding. It is planned for 300 MW of IT load. The operator reports 75 MW running.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
300 MW
Running now
75 MW
Operators rarely publish this
Operator
DCI Indonesia
Colocation
AI workloads
Confirmed
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusConfirmed

Tier IV campus marketed to hyperscalers; JK6 (36MW, launched Jun 2025) described by DCI as the largest single-build DC in Indonesia; DCI markets 6 global cloud providers on-campus. No published rack-density/liquid-cooling spec. Liquid cooling stated by w.media on 2025-06-04. JK6 building (36MW) at H1 Cibitung: liquid cooling for high-density workloads.

Phases

JK1 · OperationalSize not published, target 2013
JK2 · OperationalSize not published
JK3 · OperationalSize not published
JK5 · Operational15 MW, target 2023
JK6 · Operational36 MW, target 2025

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, EquitySalim Group
Funder, EquityAnthoni Salim
Client, reported, unconfirmedUndisclosed global cloud providers (6)
Water and cooling
CoolingDirect liquid cooling Reported source ↗
JK6 building (36MW) at H1 Cibitung: liquid cooling for high-density workloads

Sources checked 2026-09-11

  1. dci-indonesia.com
  2. baxtel.com
  3. baxtel.com

More in Greater Jakarta

Also run by DCI Indonesia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.