Princeton Digital Group data center projects

Malaysia, Indonesia, India and Singapore · dataset updated 2026-09-27

ArusGrid tracks 9 active data center projects operated by Princeton Digital Group, with 1,096 MW of planned IT load, across Malaysia, Indonesia, India and Singapore. Of these, 2 are operational, 1 is operational and expanding, 3 are under construction, 1 is at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 456 MW. Disclosed running capacity is 80 MW.

ArusGrid classes the operator as colocation. The largest project is Princeton Digital Group JH2 at 300 MW in Johor, announced only. AI workloads are confirmed at 3 sites. Named funders across its projects are Warburg Pincus, Ontario Teachers' Pension Plan, Mubadala, DBS, HSBC and Maybank. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Princeton Digital Group JH2Senai (Kulai)Announced300undisclosedPrinceton Digital GroupConfirmed
PDG JC4, GIIC BekasiCikarang, BekasiUnder construction240undisclosedPrinceton Digital GroupLikely
Princeton Digital Group JH1Sedenak (Kulai)Expanding15052Princeton Digital GroupConfirmed
PDG JC3, GIIC Kota DeltamasCikarang, BekasiUnder construction120undisclosedPrinceton Digital GroupLikely
Princeton Digital Group BT1BatamUnder construction96undisclosedPrinceton Digital GroupLikely
PDG HY1HyderabadLand and permitting90undisclosedPrinceton Digital GroupLikely
PDG CH1ChennaiAnnounced72undisclosedPrinceton Digital GroupLikely
PDG JC1 & JC2, MM2100 CibitungCibitung, BekasiOperational2828Princeton Digital GroupNo signal either way
Princeton Digital SG1SingaporeOperationalnone publishedundisclosedPrinceton Digital GroupConfirmed

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.