ArusGrid tracks 8 active data center projects operated by Bridge Data Centres, with 631 MW of planned IT load, across Thailand and Malaysia. Of these, 2 are operational, 2 are operational and expanding, 2 are under construction and 2 are at the land and permitting stage. Projects under construction or commissioning account for 414 MW. Disclosed running capacity is 36 MW.

ArusGrid classes the operator as colocation. Projects appear under the names Bridge Data Centres (Chindata), Bridge Data Centres (Chindata/Bain), Bridge Data Centres (Malaysia IV), Bridge Data Centres (Malaysia VII) and Bridge Data Centres IIO (Thailand). The largest project is Bridge Data Centres Chonburi Hyperscale Campus at 214 MW in EEC (Eastern Seaboard), under construction. Named funders across its projects are Bain Capital. Disclosed tenants across its projects are ByteDance.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Bridge Data Centres Chonburi Hyperscale CampusKhlong Tamru, Mueang ChonburiUnder construction214undisclosedBridge Data Centres IIO (Thailand)Likely
Bridge Data Centres MY07Ulu TiramUnder construction200undisclosedBridge Data Centres (Chindata/Bain)Likely
Bridge Data Centres MY06Sedenak (Kulai)Operational110undisclosedBridge Data Centres (Chindata/Bain)Likely
Bridge Data Centres MY01/MY02CyberjayaExpanding10720Bridge Data Centres (Chindata)Unlikely
Bridge Data Centres PlentongPlentongLand and permittingnone publishedundisclosedBridge Data Centres (Malaysia IV)No signal either way
Bridge Data Centres BantingBanting (Kota Seri Langat)Land and permittingnone publishedundisclosedBridge Data Centres (Malaysia VII)No signal either way
Bridge Data Centres MY03Bukit JalilExpandingnone published16Bridge Data Centres (Chindata)No signal either way
Bridge Data Centres BKK01 (ex-WHA Bangkok DC)Samut PrakanOperationalnone published0.45Bridge Data CentresNo signal either way

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.