ArusGrid tracks 9 active data center projects in Greater Manila, the Philippines, with 517 MW of planned IT load. Of these, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Operators have disclosed 66 MW actually running, a figure most of them do not publish.
The largest project is STT Fairview (STT GDC 'Polaris' campus) at 124 MW, operational. The operators with the most planned capacity here are VITRO (ePLDT) (150 MW across 2 projects), STT GDC (124 MW across 1 project) and Evolution DC (100 MW across 1 project). Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| STT Fairview (STT GDC 'Polaris' campus) | Quezon City | Operational | 124 | 32 | STT GDC Philippines | Likely |
| Evolution PH01 Manila (Gateway Business Park, General Trias) | General Trias | Land and permitting | 100 | undisclosed | Evolution Data Centres | Likely |
| VITRO General Trias (PLDT 12th data center) | General Trias | Announced | 100 | undisclosed | VITRO Inc. (ePLDT / PLDT) | Likely |
| Digital Halo MNL1 | Cainta | Operational | 70 | 6.5 | Digital Halo | Likely |
| VITRO Sta. Rosa (VSR) | Santa Rosa | Operational | 50 | 10 | VITRO Inc. (ePLDT / PLDT) | Confirmed |
| A-FLOW ML1 | Biñan | Operational | 36 | 6 | A-FLOW (FLOW Digital Infrastructure x AyalaLand Logistics) | No signal either way |
| The Hive (Beeinfotech PH) | Quezon City (Bridgetowne) | Operational | 20 | undisclosed | Bee Information Technology PH (Beeinfotech) | Likely |
| YCO Cloud Campus One (Malvar One / M1) | Malvar | Operational | 12 | 12 | YCO Cloud Centers | No signal either way |
| EdgeConneX / Aboitiz InfraCapital MNL01 | Metro Manila (site not disclosed) | On hold | 5 | undisclosed | EdgeConneX / Aboitiz InfraCapital JV | No signal either way |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Converge Parañaque hyperscale data center | Parañaque | Cancelled | 49 | undisclosed | Converge ICT Solutions | No signal either way |