VITRO Sta. Rosa (VSR)

Santa Rosa, Laguna, Philippines · Greater Manila market · location approximate to city level

VITRO Sta. Rosa (VSR) is a data center project in Santa Rosa, Philippines, operated by VITRO Inc. (ePLDT / PLDT). It is operational. It is planned for 50 MW of IT load. The operator reports 10 MW running.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
50 MW
Running now
10 MW
Operators rarely publish this
Operator
VITRO Inc. (ePLDT / PLDT)
Telco
AI workloads
Confirmed
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusConfirmed

Inaugurated 23 Apr 2025 as the Philippines' first hyperscale DC built specifically for AI workloads; equipped with NVIDIA-powered GPU servers and offers the country's first GPU-as-a-Service (GPUaaS). Actual GPU deployment on site = confirmed under the 4-tier rule.

Phases

Initial energization (IT load) · Operational10 MW, target 2025

Who is behind it

OperatorVITRO Inc. (ePLDT / PLDT) · Telco
Funder, EquityPLDT Inc.

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

PLDT 500MW data center ambition
Other
Not disclosed
Vitro REIT IPO (PLDT/ePLDT)
Platform capital
US$396m

Platform capital spans several sites. It is never added to this project's own figure.

Who builds it
Main contractorMDBI (Makati Development Corporation and Bouygues Batiment International) · Sep 2023 Confirmed source ↗
Superstructure general contractor for DC, central utility, administration and ancillary buildings; 43,632 sqm
Power supply
Dedicated substationMeralco · 67 MVA · 115kV · Jul 2025 Confirmed source ↗
Dedicated 115kV switching station opened November 2024. 17MW initial load and 67 MVA ultimate load per Meralco. Press at the opening cited 50MW anticipated demand.

Sources checked 2026-09-11

  1. bworldonline.com
  2. datacenterdynamics.com
  3. rcrwireless.com
  4. meralcomain.s3.ap-southeast-1.amazonaws.com
  5. datacenterdynamics.com

More in Greater Manila

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.