Data center projects in Clark / Central Luzon

Philippines · Southeast Asia · dataset updated 2026-09-27

ArusGrid tracks 1 active data center project in Clark / Central Luzon, the Philippines, with 12 MW of planned IT load. It is operational. Operators have disclosed 12 MW actually running, a figure most of them do not publish.

The operators with the most planned capacity here are Converge ICT (12 MW across 1 project). No third party publishes a colocation vacancy rate for Clark / Central Luzon, and ArusGrid does not estimate one.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Converge Angeles Data CenterAngeles CityOperational1212Converge ICT SolutionsLikely

Cancelled

ProjectCityStagePlanned MWRunning MWOperatorAI
Narra Technology Park hyperscale campusCapas / Bamban (New Clark City)Cancelled300undisclosedEndec Group / Narra Technology Park Development Inc.No signal either way

Other markets in Philippines

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.