ArusGrid tracks 1 active data center project in Clark / Central Luzon, the Philippines, with 12 MW of planned IT load. It is operational. Operators have disclosed 12 MW actually running, a figure most of them do not publish.
The operators with the most planned capacity here are Converge ICT (12 MW across 1 project). No third party publishes a colocation vacancy rate for Clark / Central Luzon, and ArusGrid does not estimate one.
Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Converge Angeles Data Center | Angeles City | Operational | 12 | 12 | Converge ICT Solutions | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Narra Technology Park hyperscale campus | Capas / Bamban (New Clark City) | Cancelled | 300 | undisclosed | Endec Group / Narra Technology Park Development Inc. | No signal either way |