ArusGrid tracks 3 active data center projects in Sarawak & E. Malaysia, Malaysia, with 17 MW of planned IT load. Of these, 1 is at the land and permitting stage and 2 are announced only.
The largest project is FutureData Park (Ph1: Global Telecommunications DC) at 17 MW, at the land and permitting stage. The operators with the most planned capacity here are FutureData (TSG Group + Cyclect consortium) (17 MW across 1 project) and Zecon (1 project). No third party publishes a colocation vacancy rate for Sarawak & E. Malaysia, and ArusGrid does not estimate one.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| FutureData Park (Ph1: Global Telecommunications DC) | Kota Samarahan | Land and permitting | 17 | undisclosed | FutureData (TSG Group + Cyclect consortium) | No signal either way |
| Kota Petra Green Technology Park AI DCs | Kuching (Petra Jaya) | Announced | none published | undisclosed | Zecon Berhad | Likely |
| Kuching AI Data Campus | Kuching (Tanjung Embang) | Announced | none published | undisclosed | Sarawak Government (PPP, partner TBD) | Likely |
All projects in Malaysia · Full directory